Project

General

Profile

Actions

action #59016

open

coordination #53249: [epic][qe-core][functional] ensure that grub_test gets a booting system

[qe-core][functional] Enhance reconnect_mgmt_console

Added by SLindoMansilla over 4 years ago. Updated about 1 month ago.

Status:
Workable
Priority:
Normal
Assignee:
-
Category:
Spike/Research
Target version:
SUSE QA - Milestone 31
Start date:
2020-02-22
Due date:
% Done:

0%

Estimated time:
42.00 h
Difficulty:

Description

The goal of this module is to reconnect the console after the system is booted/rebooted on remote backends.

Tasks

  1. Figure out the steps in which the console has to be disconnected and reconnected again
    • Restart before or after disconnect?
    • At which point should the console be reconnected
  2. Merge reboot_after_installation and reconnect_mgmt_console
  3. reboot_after_installation will always leave for a following module a known system state that doesn't change over time. (grub menu? login screen?)

Related issues 2 (1 open1 closed)

Related to qe-yam - action #88491: [s390x][opensuse] test fails in reconnect_management_console - ssh does not work as a result of disabled ssh serviceClosedriafarov2021-02-09

Actions
Follows openQA Tests - action #59014: [qe-core][functional] Enhanced grub_test moduleNew2020-02-21

Actions
Actions #1

Updated by szarate over 4 years ago

  • Assignee deleted (mgriessmeier)
Actions #2

Updated by szarate over 4 years ago

  • Priority changed from Normal to High
Actions #3

Updated by SLindoMansilla over 4 years ago

  • Description updated (diff)
  • Category changed from Enhancement to existing tests to Spike/Research
  • Status changed from New to Workable
  • Priority changed from High to Normal
  • Target version set to Milestone 28
  • Estimated time set to 42.00 h
Actions #4

Updated by mgriessmeier over 4 years ago

  • Target version changed from Milestone 28 to Milestone 31

planning for M31 for now

Actions #5

Updated by SLindoMansilla about 4 years ago

  • Follows action #59014: [qe-core][functional] Enhanced grub_test module added
Actions #6

Updated by tjyrinki_suse over 3 years ago

  • Subject changed from [functional][u] Enhance reconnect_mgmt_console to [qe-core][functional] Enhance reconnect_mgmt_console
Actions #7

Updated by szarate about 3 years ago

  • Related to action #88491: [s390x][opensuse] test fails in reconnect_management_console - ssh does not work as a result of disabled ssh service added
Actions #8

Updated by skriesch about 3 years ago

One hint I discussed with the Yast team because it is strange in the tests. The ssh port has been opened, but the ssh service is disabled. installation_overview is the reason for a failed reconnect_management_console test.

Actions #9

Updated by geor almost 3 years ago

  • Assignee set to geor
Actions #10

Updated by geor over 2 years ago

  • Assignee deleted (geor)
Actions #11

Updated by livdywan over 1 year ago

This ticket was set to Normal priority but was not updated within the SLO period. Please consider picking up this ticket or just set the ticket to the next lower priority.

Actions #12

Updated by slo-gin about 1 month ago

This ticket was set to Normal priority but was not updated within the SLO period. Please consider picking up this ticket or just set the ticket to the next lower priority.

Actions

Also available in: Atom PDF