Project

General

Profile

Actions

coordination #125846

closed

[epic] March Prototype testing

Added by jlausuch about 1 year ago. Updated 7 months ago.

Status:
Resolved
Priority:
Normal
Assignee:
-
Target version:
-
Start date:
2023-03-13
Due date:
% Done:

100%

Estimated time:
(Total: 0.00 h)
Difficulty:

Description

For March prototype we have a 2 main deliverables:

Bedrock is like generic server-flavor OS and Micro is similar to SLE Micro or MicroOS flavor with limited set of packages.

QE Department has to provide test coverage for all the features and all the images in the 2 flavors.

This epic aims to collect all the needed tickets related to March prototype testing.


Subtasks 2 (0 open2 closed)

action #125852: Create 2 new job groups in openqa.opensuse.org to hold the 2 new image flavorsResolvedjlausuch2023-03-13

Actions
action #125855: Create OBS-sync scripts for ALP Micro and BedrockResolvedjlausuch2023-03-13

Actions

Related issues 7 (0 open7 closed)

Related to openQA Tests - action #124209: [qe-core] Testing of PED-2828: ISC Kea DHCP serverResolveddvenkatachala2023-05-252023-05-25

Actions
Related to openQA Tests - action #121093: [qe-core][alp] Test network manager on alpResolvedrfan12023-05-252023-05-25

Actions
Related to openQA Tests - action #117616: [qe-core] How to start the firewalld containerResolveddvenkatachala2023-05-252023-05-25

Actions
Related to qe-yam - action #126041: Manual testing of D-Installer for ALP Bedrock (March Prototype)Resolvedleli2023-03-302023-03-30

Actions
Related to qe-yam - action #126044: Manual testing of D-Installer for ALP Micro (March Prototype)ResolvedJRivrain2023-03-30

Actions
Related to qe-yam - action #126047: Manual testing of Containerized YaST for ALP Micro (March Prototype)Resolvedsyrianidou_sofia2022-09-122023-03-30

Actions
Related to qe-yam - action #126050: Manual testing of Containerized YaST for ALP Bedrock (March Prototype)Resolvedtinawang1232022-09-122023-03-30

Actions
Actions #1

Updated by szarate about 1 year ago

  • Related to action #124209: [qe-core] Testing of PED-2828: ISC Kea DHCP server added
Actions #2

Updated by szarate about 1 year ago

  • Related to action #121093: [qe-core][alp] Test network manager on alp added
Actions #3

Updated by szarate about 1 year ago

  • Related to action #117616: [qe-core] How to start the firewalld container added
Actions #7

Updated by xlai about 1 year ago

A reminder, the feature list in https://jira.suse.com/issues/?jql=project%20%3D%20PED%20AND%20fixVersion%20%3D%20%22ALP%20March%20Prototype%22 is not complete.

With filter "project = PED AND (fixVersion = "ALP March Prototype" or labels = "MarchPrototype") AND type = Epic", it will show some other features, eg "PED-3128 virt-scenario needs to be extended to support creation of CVM configurations", which will come for sure in March prototype.

Besides, I suspect the jira feature status is not fully synced with real progress? For example, as listed in https://progress.opensuse.org/issues/125471#note-4, I find 8 features that are related with VT and taget for March prototype, but only one feature in "Implementation", all other seven features are initial "Open" status, even for those fundamental features like "[ALP Bedrock] Images for KVM Hypervisors" and "[ALP Micro]KVM image".
Then, what can be expect to come for march prototype and how can we prepare test with such high uncertainty? @janstehlik HDYT?

Actions #8

Updated by JERiveraMoya about 1 year ago

  • Related to action #126041: Manual testing of D-Installer for ALP Bedrock (March Prototype) added
Actions #9

Updated by JERiveraMoya about 1 year ago

  • Related to action #126044: Manual testing of D-Installer for ALP Micro (March Prototype) added
Actions #10

Updated by JERiveraMoya about 1 year ago

  • Related to action #126047: Manual testing of Containerized YaST for ALP Micro (March Prototype) added
Actions #11

Updated by JERiveraMoya about 1 year ago

  • Related to action #126050: Manual testing of Containerized YaST for ALP Bedrock (March Prototype) added
Actions #15

Updated by jlausuch 7 months ago

  • Status changed from Workable to Resolved
Actions

Also available in: Atom PDF