coordination #116449
[epic] Manual testing for ALP in Yam squad
100%
Description
Motivation¶
There are two Work Packages associated with 1:1 System Management job group:
- Cockpit
- Containerized YaST And there is one Work Package associated with Installation/Deployment:
- D-Installer
These Work Packages are tested by the Work Group itself, but some manual testing might be required from our side.
Acceptance criteria¶
AC1: Exploratory testing of ALP in the Yam scope
Additional information¶
Documentation: https://documentation.suse.com/alp/all/single-html/alp/index.html
Check https://confluence.suse.com/display/LEONG/ALP+September+prototype.+Workgroups+and+decisions
and the ALP plan in slide 10: https://mysuse.sharepoint.com/:p:/s/LinuxPlatformsPMTeam/EZBhw4uCwU1Nhm72KNkCwHABTQNQh5sQJIcMduXtWqlEVw?e=v0nNQL&isSPOFile=1
Info for September:
Also notice that "Only one pre-built bootable image will be delivered for the September PoC: x86_64 UEFI"
In the official repo with the images https://download.opensuse.org/repositories/SUSE:/ALP/images/
we just need to use version 9.2 flavor KVM. In previous version, which when trying to run they already indicates that are obsolete, there were more flavors.
We can see how it was tested in openQA initially:
https://openqa.opensuse.org/tests/overview?version=0.1&build=19.9&groupid=100&distri=alp
builds are obsolete (jlausuch plan to move to new image path in O3) but it is a good reference how to use it as it is very similar to Microos.
Subtasks
Related issues
History
#1
Updated by JERiveraMoya 5 months ago
- Subject changed from Manual testing 1:1 System Management to [Epic] Manual testing of deliverables for Work Group 1:1 System Management
#2
Updated by JERiveraMoya 5 months ago
- Subject changed from [Epic] Manual testing of deliverables for Work Group 1:1 System Management to [Epic] Manual testing of deliverables for Work Group 1:1 System Management (ALP September prototype)
#3
Updated by JERiveraMoya 5 months ago
- Description updated (diff)
#4
Updated by JERiveraMoya 5 months ago
- Description updated (diff)
#5
Updated by JERiveraMoya 5 months ago
- Tags deleted (
qe-yast-refinement) - Status changed from New to Workable
#6
Updated by slo-gin 5 months ago
This ticket was set to Urgent priority but was not updated within the SLO period. Please consider picking up this ticket or just set the ticket to the next lower priority.
#7
Updated by JERiveraMoya about 2 months ago
- Subject changed from [Epic] Manual testing of deliverables for Work Group 1:1 System Management (ALP September prototype) to [epic] Manual testing for ALP in Yam squad
- Description updated (diff)
- Status changed from Workable to In Progress
- Assignee set to JERiveraMoya
#8
Updated by JERiveraMoya about 2 months ago
- Parent task set to #121933
#9
Updated by JERiveraMoya about 2 months ago
- Parent task deleted (
#121933)
#10
Updated by JERiveraMoya about 2 months ago
- Related to coordination #121933: [saga] Innovation in Yam squad added