Project

General

Profile

coordination #116449

[epic] Manual testing for ALP in Yam squad

Added by JERiveraMoya 5 months ago. Updated about 2 months ago.

Status:
In Progress
Priority:
Normal
Assignee:
Target version:
Start date:
2022-09-12
Due date:
% Done:

100%

Estimated time:
(Total: 0.00 h)

Description

Motivation

There are two Work Packages associated with 1:1 System Management job group:

  • Cockpit
  • Containerized YaST And there is one Work Package associated with Installation/Deployment:
  • D-Installer

These Work Packages are tested by the Work Group itself, but some manual testing might be required from our side.

Acceptance criteria

AC1: Exploratory testing of ALP in the Yam scope

Additional information

Documentation: https://documentation.suse.com/alp/all/single-html/alp/index.html

Check https://confluence.suse.com/display/LEONG/ALP+September+prototype.+Workgroups+and+decisions
and the ALP plan in slide 10: https://mysuse.sharepoint.com/:p:/s/LinuxPlatformsPMTeam/EZBhw4uCwU1Nhm72KNkCwHABTQNQh5sQJIcMduXtWqlEVw?e=v0nNQL&isSPOFile=1

Info for September:

Also notice that "Only one pre-built bootable image will be delivered for the September PoC: x86_64 UEFI"
In the official repo with the images https://download.opensuse.org/repositories/SUSE:/ALP/images/
we just need to use version 9.2 flavor KVM. In previous version, which when trying to run they already indicates that are obsolete, there were more flavors.
We can see how it was tested in openQA initially:
https://openqa.opensuse.org/tests/overview?version=0.1&build=19.9&groupid=100&distri=alp
builds are obsolete (jlausuch plan to move to new image path in O3) but it is a good reference how to use it as it is very similar to Microos.


Subtasks

action #116452: Initial Manual testing of Cockpit (ALP September prototype)Resolvedrainerkoenig

action #116455: Initial Manual Testing of Containerized YaST (ALP September prototype)Resolvedgeor

action #121840: Initial manual testing for D-Installer (ALP December prototype) - Part 1ResolvedJRivrain

action #121843: Initial manual testing for D-Installer (ALP December prototype) - Part 2Resolvedsyrianidou_sofia


Related issues

Related to qe-yam - coordination #121933: [saga] Innovation in Yam squadIn Progress2022-09-12

History

#1 Updated by JERiveraMoya 5 months ago

  • Subject changed from Manual testing 1:1 System Management to [Epic] Manual testing of deliverables for Work Group 1:1 System Management

#2 Updated by JERiveraMoya 5 months ago

  • Subject changed from [Epic] Manual testing of deliverables for Work Group 1:1 System Management to [Epic] Manual testing of deliverables for Work Group 1:1 System Management (ALP September prototype)

#3 Updated by JERiveraMoya 5 months ago

  • Description updated (diff)

#4 Updated by JERiveraMoya 5 months ago

  • Description updated (diff)

#5 Updated by JERiveraMoya 5 months ago

  • Tags deleted (qe-yast-refinement)
  • Status changed from New to Workable

#6 Updated by slo-gin 5 months ago

This ticket was set to Urgent priority but was not updated within the SLO period. Please consider picking up this ticket or just set the ticket to the next lower priority.

#7 Updated by JERiveraMoya about 2 months ago

  • Subject changed from [Epic] Manual testing of deliverables for Work Group 1:1 System Management (ALP September prototype) to [epic] Manual testing for ALP in Yam squad
  • Description updated (diff)
  • Status changed from Workable to In Progress
  • Assignee set to JERiveraMoya

#8 Updated by JERiveraMoya about 2 months ago

  • Parent task set to #121933

#9 Updated by JERiveraMoya about 2 months ago

  • Parent task deleted (#121933)

#10 Updated by JERiveraMoya about 2 months ago

Also available in: Atom PDF