coordination #37910

closed

coordination #121720: [saga][epic] Migration to QE setup in PRG2+NUE3 while ensuring availability

coordination #129280: [epic] Move from SUSE NUE1 (Maxtorhof) to new NBG Datacenters

[tools][epic] Migration of or away from qanet.qa.suse.de

Added by nicksinger almost 6 years ago. Updated 5 months ago.

Status:
Resolved
Priority:
Normal
Assignee:
Target version:
Start date:
2018-06-29
Due date:
% Done:

100%

Estimated time:
(Total: 0.00 h)

Description

qanet is an SLES11SP0 and needs a newer replacement to be safe for the future.


Replacement hardware

1. Physical machine

General advantages:

  • Potentially less problems then a virtualized machine (less layers -> less problems (especially in the network world))

General disadvantages:

  • Less flexible then a virtual machine

1.1. Use the same machine as qanet runs on

Advantages:

  • No new hardware needed
  • qanet is a quad core with 6GB of RAM -> More then sufficient for a network management server

Disadvantages:

  • Downtime for the whole network while migrating
  • In-place upgrade from SLE11 up to SLE15 might render the system unusable and then requires a re-installation
  • No (fast) way back in case of major issues after upgrading
  • Hardware of the server is long out-of-service

1.2. Buy new hardware

Advantages:

  • Parallel setup with already running qanet possible
  • After initial setup and migration, a fail-over setup is possible
  • Fallback in case of major issues after migration should be easily possible (unplug new, plugin old)
  • Hardware service for at least 2-3 years

Disadvantages:

  • Investment needed

2. Virtual machine

General advantages

  • More flexible in the future (VMs can be moved to other hosts, easy backup, failover easily possible)

General disadvantages

  • Setup of hypervisor can influence the functionality of network server

User qamaster.qa.suse.de as VM host

Advantages:

  • Already exists

Disadvantages:

  • Already close to it's capacity limit (renegotiation with users (of qamaster) needed)
  • Also the hypervisor OS needs an upgrade (SLES12)


Subtasks 5 (0 open5 closed)

action #38012: [tools][labs][medium] Setup DHCPv6 and DNS AAAA records for VLAN12Rejectedokurz2018-06-30

Actions
action #38018: [labs][tools] Setup new qanetRejectedokurz2018-06-29

Actions
action #81192: [tools] Migrate (upgrade or replace) qanet.qa.suse.de to a supported, current OS size:MResolvedokurz2020-12-18

Actions
action #81200: [tools][labs] some partitions on qanet are 100% full, seems like /data/backups has no new archives since 20201009 due to thatResolvedokurz2020-12-18

Actions
openQA Infrastructure - action #134051: Eng-Infra maintained DNS server for .qa.suse.de taking over from qanet size:MResolveddheidler2023-08-09

Actions

Related issues 1 (0 open1 closed)

Related to QA - action #132623: Decommissioning of selected selected LSQ QE machines from NUE1-SRV2Resolvedokurz2023-07-12

Actions
Actions #1

Updated by nicksinger almost 6 years ago

  • Subject changed from [labs] Preparing the migration of qanet.qa.suse.de to [labs][epic] Preparing the migration of qanet.qa.suse.de
Actions #2

Updated by szarate over 3 years ago

  • Tracker changed from action to coordination
Actions #4

Updated by okurz about 2 years ago

  • Parent task set to #109743
Actions #6

Updated by okurz 11 months ago

  • Parent task changed from #109743 to #130955
Actions #7

Updated by okurz 11 months ago

  • Subject changed from [labs][epic] Preparing the migration of qanet.qa.suse.de to [tools][epic] Preparing the migration of qanet.qa.suse.de
  • Target version set to future
Actions #8

Updated by okurz 11 months ago

  • Tags set to infra, qanet, maxtorhof, nue1, dhcp, dns, pxe
  • Subject changed from [tools][epic] Preparing the migration of qanet.qa.suse.de to [tools][epic] Migration of qanet.qa.suse.de
  • Category set to Infrastructure
Actions #9

Updated by okurz 9 months ago

  • Related to action #132623: Decommissioning of selected selected LSQ QE machines from NUE1-SRV2 added
Actions #10

Updated by okurz 8 months ago

  • Parent task changed from #130955 to #129280
Actions #11

Updated by okurz 8 months ago

  • Subject changed from [tools][epic] Migration of qanet.qa.suse.de to [tools][epic] Migration of or away from qanet.qa.suse.de
Actions #12

Updated by okurz 8 months ago

  • Subtask #134051 added
Actions #13

Updated by okurz 7 months ago

  • Status changed from New to Blocked
  • Assignee set to okurz
  • Target version changed from future to Tools - Next
Actions #14

Updated by okurz 7 months ago

  • Subtask #137327 added
Actions #15

Updated by okurz 5 months ago

  • Status changed from Blocked to Resolved
  • Target version changed from Tools - Next to Ready
Actions