action #113701
open
[qe-core] Move workers back to grenache
Added by okurz over 2 years ago.
Updated about 2 years ago.
Description
Motivation¶
#113528#note-25 in particular, however due to AC failures in Server Room 2, we have to ask the question: does it make sense to move them back?, given that summer is not over yet.
Suggestions¶
- Figure out in which server rooms are the hosts needed by grenache or openqaworker2 after the changes done for #113528
- Get the date for the possible move of the Server Room 2 and Extension
- Copied from action #113528: [qe-core] test fails in bootloader_zkvm - performance degradation in the s390 network is causing serial console to be unreliable (and killing jobs slowly) added
- Description updated (diff)
- Project changed from openQA Tests (public) to openQA Infrastructure (public)
- Subject changed from [qe-core] followup to "test fails in bootloader_zkvm - performance degradation in the s390 network is causing serial console to be unreliable (and killing jobs slowly)" - move workers back to grenache to [qe-core] move workers back to grenache after https://sd.suse.com/servicedesk/customer/portal/1/SD-92689 is solved
- Category deleted (
Bugs in existing tests)
- Assignee deleted (
szarate)
- Subject changed from [qe-core] move workers back to grenache after https://sd.suse.com/servicedesk/customer/portal/1/SD-92689 is solved to [qe-core] Move workers back to grenache
- Description updated (diff)
- Status changed from New to Blocked
- Copied to action #114400: [qe-core] Rebalance OpenQA worker distribution added
- Target version deleted (
QE-Core: Ready)
Meeting: We need more info, and AC situation solved.
- Target version set to future
I suppose this should be in future if it's still blocked by #114400 which is in future. Alternatively it would be great to clarify what else this is blocked by.
- Related to action #116794: Bring back grenache.qa.suse.de + grenache-1.qa.suse.de added
should be worked on after #116794 is resolved
- Status changed from Blocked to New
- Priority changed from Normal to High
#116794 is resolved. openQA worker instances can be moved back to grenache-1.qa.suse.de again.
- Related to action #116287: [qe-core][s390x] SSH serial terminal connection issues on s390x workers added
- Related to action #119443: Conduct the migration of SUSE openQA systems from Nbg SRV1 to new security zones size:M added
Also available in: Atom
PDF