We require proper modules testing
As the ProMan (maritawerner) clarified: "we have to do installationi and some basic tests for SLE 15. For SLE 12 SP4 QAM will make sure that nothing breaks inside, we have to cover installation tests only"
- Checklist item changed from to [ ] SLE
- Target version deleted (
156)
- Parent task set to #15108
- Subject changed from Modules - Legacy to [sle][functional]Modules - Legacy
- Target version set to Milestone 12
I suggest to revisit for SLE12 SP4 and SLE15 at the same time
- Assignee set to maritawerner
- Target version deleted (
Milestone 12)
Start date: 11/11/2015
another interesting item.
Removing target version. There are more critical issues for me (and this has prio: Low).
@maritawerner: would you like to see this done for SLE15? What is the prio for this from your point of view?
hold on, it seems like you overlooked my last comment in #9468#note-4 : "I suggest to revisit for SLE12 SP4 and SLE15 at the same time". This is why I set the target version to M12 when we should be more stable with SLE15 and should have a SLE12SP4 starting. I suggest to readd it to M12.
- Assignee deleted (
maritawerner)
- Priority changed from Low to Normal
During the Interlock discussions I found out that QAM will not test the Legacy module for a new code stream, only for updates.So we have to do installationi and some basic tests for SLE 15. For SLE 12 SP4 QAM will make sure that nothing breaks inside, we have to cover installation tests only.
- Checklist item changed from [ ] SLE to
Removing checklist as this is a checklist with 1 item only, so not really useful.
"we have to do installationi and some basic tests for SLE 15. For SLE 12 SP4 QAM will make sure that nothing breaks inside, we have to cover installation tests only." - I will then update the description of the ticket to reflect current expectations.
- Description updated (diff)
- Target version set to Milestone 12
- Status changed from New to Resolved
- Assignee set to okurz
- Target version changed from Milestone 12 to Milestone 13
Covered in the "gnome+proxy_SCC+allmodules" test suite where we at least enable the module:
so the module activation and installation is covered in general. We do not have specific test to see if packages within the legacy module work within QA SLE functional but QA SLE migration is relying on the legacy module anyways so I consider ourselves done here.