action #41915
open[sle] test fails in guest_upgrade_run
0%
Description
Observation¶
openQA test in scenario sle-12-SP4-Server-DVD-x86_64-prj4_guest_upgrade_sles12sp3_on_sles12sp3-xen@64bit-ipmi fails in
guest_upgrade_run
Other failures on Xen:
- https://openqa.suse.de/tests/2110311#step/guest_upgrade_run/16
- https://openqa.suse.de/tests/2110309#step/guest_upgrade_run/16
Reproducible¶
Fails since (at least) Build 0403 (current job)
Expected result¶
Last good: 0396 (or more recent)
Further details¶
Always latest result in this scenario: latest
Updated by okurz about 6 years ago
This is an autogenerated message for openQA integration by the openqa_review script:
This bug is still referenced in a failing openQA test: prj4_guest_upgrade_sles11sp4_on_developing-xen
https://openqa.suse.de/tests/2163511
Updated by waynechen55 about 6 years ago
okurz wrote:
This is an autogenerated message for openQA integration by the openqa_review script:
This bug is still referenced in a failing openQA test: prj4_guest_upgrade_sles11sp4_on_developing-xen
https://openqa.suse.de/tests/2163511
I am looking into these associated failed test suites.
Updated by waynechen55 about 6 years ago
waynechen55 wrote:
okurz wrote:
This is an autogenerated message for openQA integration by the openqa_review script:
This bug is still referenced in a failing openQA test: prj4_guest_upgrade_sles11sp4_on_developing-xen
https://openqa.suse.de/tests/2163511I am looking into these associated failed test suites.
I did not found any product issue in last several builds. I am currently not working on this ticket or related test suites.
Updated by XGWang0 about 6 years ago
- Status changed from New to Feedback
sle-12-SP4-Server-DVD-x86_64-prj4_guest_upgrade_sles12sp3_on_sles12sp3-xen@64bit-ipmi is not product issue instead of network issue
The failed test cases for sles-11-sp4 as guest upgrade on xen to sles-12-sp4 met a bug:1102707.
Updated by okurz over 3 years ago
- Priority changed from Normal to Low
This ticket was set to "Normal" priority but was not updated within 730 days which is 2 times the period of the SLO for "Normal" tickets (365 days) as described on https://progress.opensuse.org/projects/openqatests/wiki/Wiki#SLOs-service-level-objectives . The ticket will be set to the next lower priority of "Low".