General

Profile

XGWang0

  • Login: XGWang0
  • Email: xgwang@suse.com
  • Role: Developer
  • Connect profile: 1
  • Registered on: 2017-01-12
  • Last sign in: 2017-01-12

Issues

open closed Total
Assigned issues 0 1 1
Reported issues 1 1 2

Projects

Project Roles Registered on
QA (public) Developer 2018-11-14
openQA Project (public) Developer 2018-08-29
openQA Infrastructure (public) Developer 2018-10-16
openQA Tests (public) Developer 2018-08-29
ALP Developer 2022-06-14
Containers and images Developer 2021-03-08
openQA auto review Developer 2022-05-04
qe-yam Developer 2020-10-02

Activity

2021-03-04

05:10 openQA Project (public) action #88514: [virtualization][ipmi] Test incomplete sometimes due to de-activate a already "deactivate" status SUT.
okurz wrote:
> This can at best be fixed in tests though. The problem only happens if the connection was already ter...
XGWang0

2021-02-10

04:46 openQA Project (public) action #88514 (New): [virtualization][ipmi] Test incomplete sometimes due to de-activate a already "deactivate" status SUT.
Sometimes, the test is failed by incomplete, because ipmi backend executes deactivate operation on a "deactivate" st... XGWang0

2018-10-26

06:23 openQA Tests (public) action #41915 (Feedback): [sle] test fails in guest_upgrade_run
sle-12-SP4-Server-DVD-x86_64-prj4_guest_upgrade_sles12sp3_on_sles12sp3-xen@64bit-ipmi is not product issue instead of... XGWang0

2018-09-06

09:07 openQA Infrastructure (public) action #40544: [OpenQA][IPMI backend] IPMI worker can not survive reboot on dell SUT
PR:https://github.com/os-autoinst/os-autoinst/pull/1021
PR:https://github.com/os-autoinst/os-autoinst-distri-opens...
XGWang0

2018-09-05

07:04 openQA Infrastructure (public) action #40544: [OpenQA][IPMI backend] IPMI worker can not survive reboot on dell SUT
I have a fix for this issue, i will fill the PR ASAP if no issue found for my local test on dell and super-micro machine XGWang0

2018-08-29

07:44 openQA Tests (public) action #40364: [functional][y] boot_from_pxe.pm broken host installation by autoyast method for virtualization test on ipmi backend.
XGWang0 wrote:
> The PR ([[https://github.com/os-autoinst/os-autoinst-distri-opensuse/pull/5537]]) caused hang to ho...
XGWang0
05:27 openQA Tests (public) action #40364 (Resolved): [functional][y] boot_from_pxe.pm broken host installation by autoyast method for virtualization test on ipmi backend.
The PR ([[https://github.com/os-autoinst/os-autoinst-distri-opensuse/pull/5537]]) caused hang to host installation by... XGWang0

2017-05-03

05:36 openQA Tests (public) action #18834: [virtualization] Orthos machine is still not ready to be used in proxy mode testing - hang when installing via pxe
RBrownSUSE wrote:
> Have you filed any tickets with infra@suse.de?
I file a ticket to infra : https://infra.nue.sus...
XGWang0
02:29 openQA Tests (public) action #18834: [virtualization] Orthos machine is still not ready to be used in proxy mode testing - hang when installing via pxe
HI coolo:
The url of machine on orthos : https://orthos.arch.suse.de/index.php?host=2412
This machine IDRAD inf...
XGWang0

Also available in: Atom