action #118336
closed
- Tags deleted (
qe-yast-refinement)
unsupported virtualization, we should consider if this product works with PowerVM.
no need for checking tickets that I didn't move to refinement.
I will move to backlog to check later.
- Description updated (diff)
- Status changed from New to Workable
- Priority changed from Normal to High
- Target version set to Current
Looks feasible and I'm not sure about PowerVM for older products, so we can tackle it, thanks for checking it.
- Status changed from Workable to In Progress
let's send some draft PR to see how we can help.
favogt wrote:
Is this the same issue as https://progress.opensuse.org/issues/113447, i.e. caused by openQA slowness?
I can't check because the links to failed tests are broken meanwhile.
I don't think they are the same issue, cause this issue is specific for ppc64le, while the issue you mentioned is for aarch64.
leli wrote:
favogt wrote:
Is this the same issue as https://progress.opensuse.org/issues/113447, i.e. caused by openQA slowness?
I can't check because the links to failed tests are broken meanwhile.
I don't think they are the same issue, cause this issue is specific for ppc64le, while the issue you mentioned is for aarch64.
My argument is that the issue is not specific to any architecture.
- Status changed from In Progress to Resolved
- Parent task set to #121876
- Status changed from Resolved to Feedback
This is an autogenerated message for openQA integration by the openqa_review script:
This bug is still referenced in a failing openQA test: offline_sles12sp4_ltss_media_sdk-asmm-contm-lgm-tcm-wsm-pcm_all_full@ppc64le-2g
https://openqa.suse.de/tests/10917229#step/boot_to_desktop/1
To prevent further reminder comments one of the following options should be followed:
- The test scenario is fixed by applying the bug fix to the tested product or the test is adjusted
- The openQA job group is moved to "Released" or "EOL" (End-of-Life)
- The bugref in the openQA scenario is removed or replaced, e.g.
label:wontfix:boo1234
Expect the next reminder at the earliest in 132 days if nothing changes in this ticket.
- Status changed from Feedback to Resolved
- Status changed from Resolved to Feedback
This is an autogenerated message for openQA integration by the openqa_review script:
This bug is still referenced in a failing openQA test: online_sle12sp5_sles15sp4_sles15sp5_pscc_all_full_y_
https://openqa.suse.de/tests/11022913#step/online_migration_setup/1
To prevent further reminder comments one of the following options should be followed:
- The test scenario is fixed by applying the bug fix to the tested product or the test is adjusted
- The openQA job group is moved to "Released" or "EOL" (End-of-Life)
- The bugref in the openQA scenario is removed or replaced, e.g.
label:wontfix:boo1234
Expect the next reminder at the earliest in 28 days if nothing changes in this ticket.
- Status changed from Feedback to Resolved
This is an autogenerated message for openQA integration by the openqa_review script:
This bug is still referenced in a failing openQA test: online_sle12sp5_sles15sp4_sles15sp5_pscc_all_full_y_
https://openqa.suse.de/tests/11147138#step/online_migration_setup/1
To prevent further reminder comments one of the following options should be followed:
- The test scenario is fixed by applying the bug fix to the tested product or the test is adjusted
- The openQA job group is moved to "Released" or "EOL" (End-of-Life)
- The bugref in the openQA scenario is removed or replaced, e.g.
label:wontfix:boo1234
Expect the next reminder at the earliest in 28 days if nothing changes in this ticket.
Also available in: Atom
PDF