Observation¶
openQA test in scenario microos-Tumbleweed-DVD-x86_64-microos@64bit fails in
zypper_ref
fails to update in https://openqa.opensuse.org/tests/1218281#step/zypper_ref/24 and many other test scenarios. Any idea what's wrong with the network to access o3 repos?
in general network works, e.g. able to access o3 itself in https://openqa.opensuse.org/tests/1218281#step/networking/5 and o3:/var/lib/openqa/share/factory/repo/openSUSE-Tumbleweed-oss-i586-x86_64-Snapshot20200329 also exists and looks ok to me. perform code: 22 [ HTTP response code said error ] whatever that means...
but locally the files can be downloaded fine.
Reproducible¶
Fails since this Build 20200329 in multiple scenarios.
Expected result¶
Last good: 20200327 (or more recent)
Workaround¶
Retrigger tests after OBSsync is finished, most likely at the time of looking at failed jobs
Further details¶
Always latest result in this scenario: latest
- Status changed from New to In Progress
- Assignee set to favogt
@favogt you wanted to look into this with investigating live openQA sessions.
- Subject changed from [opensuse] test fails in zypper_ref - fails to update from repos on o3 but repos exists and network works to [opensuse] test fails in zypper_ref - test runs before repo synced
- Assignee changed from favogt to andriinikitin
https://openqa.opensuse.org/minion/jobs?id=136521: "finished" => "2020-03-30T06:42:21.69718Z",
The test tried to download at 2020-03-30 06:32:13 localhost(1856) [zypp] MediaCurl.cc(doGetDoesFileExist):903 perform code: 22 [ HTTP response code said error ]
So assuming the clocks are not more than 10 minutes out of sync, the test was started before the repos were available.
- Project changed from openQA Tests to openQA Project
- Description updated (diff)
- Category changed from Bugs in existing tests to Regressions/Crashes
- Status changed from In Progress to Workable
- Status changed from Workable to In Progress
I must admit it is sync problem
- Priority changed from Urgent to High
With the workaround in place I think we can treat this now with "High" priority, one down from "Urgent".
- Target version set to Current Sprint
- Status changed from In Progress to Resolved
- % Done changed from 0 to 100