closed

[functional][u] SES6: bring back BETA=1 param

Added by SShyukriev almost 5 years ago. Updated almost 5 years ago.

Status:
Resolved
Priority:
Urgent
Assignee:
Category:
Bugs in existing tests
Target version:
SUSE QA - Milestone 25
Start date:
2019-05-20
Due date:
% Done:

100%

Estimated time:
Difficulty:

Description

Observation

SES6 is still in Beta phase. But, since the setting BETA=1 was removed from medium SLE15-SP1, it is affecting SES tests.

Reproducible

  • Since Build 58.3
  • Last reproducer: create_hdd_ses_textmode
  • in sle-15-SP1-Installer-DVD-SES-x86_64-create_hdd_ses_textmode@64bit

Expected result

Last good: 58.2

Suggestions

  • Use a different medium for SES so that BETA setting can be configured separately?

Further details

Always latest result in this scenario: latest

Actions #1

Updated by SLindoMansilla almost 5 years ago

  • Subject changed from SES6: bring back BETA=1 param to [functional][u] SES6: bring back BETA=1 param
  • Description updated (diff)
  • Priority changed from Normal to Immediate
Actions #2

Updated by mgriessmeier almost 5 years ago

  • Status changed from New to Feedback
  • Assignee set to SLindoMansilla
  • Priority changed from Immediate to Urgent
  • Target version set to Milestone 25

sorry, but the only way I see here is to use your own medium for SES - we do that for example as well for caasp or jeos.
Products with different schedules should not use the same medium because it will always conflict.

If you need help with creating it, let us know.

Actions #3

Updated by riafarov almost 5 years ago

So, actual issue is that SES6 has different release schedule than SLES, but seems to be triggered by SLES build which was not in the beta phase anymore. This is one of the issues we have during GMC phase, which is not easy to solve and which got postponed last time as happens once per release. I believe we should address it this time.

UPD: I haven't seen comment from Matthias when was writing mine, but consider it as +1 to the comment above.

Actions #4

Updated by dzedro almost 5 years ago

  • Status changed from Feedback to Resolved
  • % Done changed from 0 to 100
Actions #5

Updated by szarate almost 5 years ago

  • Assignee changed from SLindoMansilla to dzedro
Actions