Description
observation¶
Multiple tests fail because of a network issue on build0428 - failed uploading logs
x86_64
ppc64le
aarch64
workaround¶
retrigger job
- Description updated (diff)
- Description updated (diff)
- Related to action #19986: [sled] checksum failed when publishing cryptlvm hdd images added
- Subject changed from [sles][functional] Multiple tests fail because of a network issue on build0428 for ppc64le and aarch64 - failed uploading logs to [sles][functional] Multiple tests time out because of a network issue on build0428 for ppc64le and aarch64 (was: failed uploading logs)
Most of the jobs you mentioned are "incomplete" because the 2h timeout was hit so the problem is that either the test just takes this long and the MAX_JOB_TIME needs to be increased or some steps of the test now take longer than they should be. And that could be because of network problems, yes.
The following mentioned jobs fail for a different reason:
- Status changed from New to Rejected
We didn't see problems after that so let's assume it was an issue in our infrastructure related to network which was either fixing itself in time or fixed without us being informed about it.
Also available in: Atom