Project

General

Profile

Actions

action #58820

open

[sporadic] test fails in cleanup_before_shutdown

Added by dheidler about 5 years ago. Updated 9 months ago.

Status:
New
Priority:
Normal
Assignee:
-
Category:
Bugs in existing tests
Target version:
-
Start date:
2019-10-29
Due date:
% Done:

0%

Estimated time:
Difficulty:

Description

Observation

openQA test in scenario sle-15-SP2-Installer-DVD-ppc64le-create_hdd_gnome@ppc64le fails in
cleanup_before_shutdown

Test suite description

image creation job used as parent for other jobs testing based on existing installation. To be used as START_AFTER_TEST=create_hdd_gnome

Reproducible

Fails since (at least) Build 72.1 (current job)

Expected result

Last good: 67.1 (or more recent)

Further details

Always latest result in this scenario: latest


Related issues 1 (1 open0 closed)

Related to openQA Tests (public) - action #89329: [qe-core] test fails in shutdown - Machine didn't shut downNew2021-03-02

Actions
Actions #1

Updated by okurz over 3 years ago

  • Related to action #89329: [qe-core] test fails in shutdown - Machine didn't shut down added
Actions #2

Updated by okurz over 3 years ago

This ticket was set to "Normal" priority but was not updated within the SLO period for "Normal" tickets (365 days) as described on https://progress.opensuse.org/projects/openqatests/wiki/Wiki#SLOs-service-level-objectives . Please consider picking up this ticket within the next 365 days or just set the ticket to the next lower priority of "Low" (no SLO related time period). This update was done as agreed within the SUSE QE Sync call 2021-09-01

Actions #3

Updated by slo-gin over 2 years ago

This ticket was set to Normal priority but was not updated within the SLO period. Please consider picking up this ticket or just set the ticket to the next lower priority.

Actions #4

Updated by slo-gin 9 months ago

This ticket was set to Normal priority but was not updated within the SLO period. Please consider picking up this ticket or just set the ticket to the next lower priority.

Actions

Also available in: Atom PDF