Project

General

Profile

Actions

action #53966

open

[opensuse] test fails in updates_packagekit_kde - icon shows updates available but popup dialog shows all up-to-date

Added by okurz almost 5 years ago. Updated about 1 month ago.

Status:
New
Priority:
Normal
Assignee:
-
Category:
Bugs in existing tests
Target version:
-
Start date:
2019-07-08
Due date:
% Done:

0%

Estimated time:
Difficulty:

Description

Observation

openQA test in scenario opensuse-15.0-DVD-Updates-x86_64-kde@64bit-2G fails in
updates_packagekit_kde

Test suite description

TIMEOUT_SCALE property is added to avoid sporadic shutdown fails in kde@USBboot_64 scenario.

Added by : oorlov;

Related ticket: poo#37000

Reproducible

Fails since (at least) Build 20190708-3 (current job)

Expected result

Last good: 20190708-2 (or more recent)

Further details

Always latest result in this scenario: latest

Actions #1

Updated by SLindoMansilla over 4 years ago

  • Priority changed from Normal to High
Actions #2

Updated by SLindoMansilla over 4 years ago

  • Subject changed from [functional][u] test fails in updates_packagekit_kde - icon shows updates available but popup dialog shows all up-to-date to [opensuse] test fails in updates_packagekit_kde - icon shows updates available but popup dialog shows all up-to-date
Actions #3

Updated by okurz over 2 years ago

  • Priority changed from High to Normal

This ticket was set to "High" priority but was not updated within 120 days which is 4 times the period of the SLO for "High" tickets (30 days) as described on https://progress.opensuse.org/projects/openqatests/wiki/Wiki#SLOs-service-level-objectives . The ticket will be set to the next lower priority of "Normal".

Actions #4

Updated by slo-gin over 1 year ago

This ticket was set to Normal priority but was not updated within the SLO period. Please consider picking up this ticket or just set the ticket to the next lower priority.

Actions #5

Updated by slo-gin about 1 month ago

This ticket was set to Normal priority but was not updated within the SLO period. Please consider picking up this ticket or just set the ticket to the next lower priority.

Actions

Also available in: Atom PDF