action #138725
closedcoordination #138728: [containers][epic] FIPS mode
[BCI] Re-enable FIPS on ppc64le and s390x
100%
Description
In https://progress.opensuse.org/issues/138716 we disabled FIPS on ppc64le and s390x due to ongoing issues with the workers. After resolving those issues, we need to re-enable those test runs.
Acceptance criteria¶
- Re-enable ppc64le and s390x test runs
- Ensure the test runs are working properly
Updated by ph03nix over 1 year ago
- Related to action #138722: [BCI] Fix FIPS on ppc64le added
Updated by ph03nix over 1 year ago
https://gitlab.suse.de/qac/qac-openqa-yaml/-/merge_requests/1379 could be reverted as a suggestion.
Updated by ph03nix over 1 year ago
- Related to action #138770: [BCI] Reduce coverage for ppc64le added
Updated by ph03nix over 1 year ago
We should not re-enable ppc64le until at least mid of December, when we are supposed to get more workers. Currently the load is too high, see #138770
Updated by okurz over 1 year ago
- Related to coordination #139010: [epic] Long OSD ppc64le job queue added
Updated by okurz over 1 year ago
ph03nix wrote in #note-5:
We should not re-enable ppc64le until at least mid of December, when we are supposed to get more workers. Currently the load is too high, see #138770
I don't think this expectation can hold. At least the tests as you are currently scheduling them are for KVM on PowerPC. There are no plans that I am aware of that can increase the capacity for KVM on PowerPC this calendar year. Potentially mid of next year we might have Power10 hardware capable to run KVM tests natively. See details about the whole story in #139010
Updated by ph03nix about 1 year ago
- Description updated (diff)
- Status changed from Blocked to Workable
Unblocking, as the issues with the s390x and ppc workers seem to have been resolved.
Updated by pherranz about 1 year ago
- Status changed from Workable to In Progress
- Assignee set to pherranz
Updated by pherranz about 1 year ago
MR ready to review: https://gitlab.suse.de/qac/qac-openqa-yaml/-/merge_requests/1541
Updated by pherranz about 1 year ago
- Status changed from In Progress to Feedback
- % Done changed from 0 to 90
Tests have been re-enabled, pending to check tomorrow if the execution fails...
Updated by pherranz about 1 year ago
I'm so sorry but the truth is that I started with this, and then several WSL fires started so I switched context :(
Updated by pherranz about 1 year ago
- Status changed from Feedback to Resolved
- % Done changed from 90 to 100
Tests are running properly. Some examples:
https://openqa.suse.de/tests/13838876
https://openqa.suse.de/tests/13838875