Project

General

Profile

Actions

action #134126

open

QA - coordination #121720: [saga][epic] Migration to QE setup in PRG2+NUE3 while ensuring availability

QA - coordination #123800: [epic] Provide SUSE QE Tools services running in PRG2 aka. Prg CoLo

Setup new PRG2 openQA worker for o3 - bare-metal testing size:M

Added by okurz 9 months ago. Updated 3 months ago.

Status:
Blocked
Priority:
Low
Assignee:
Category:
-
Target version:
Start date:
Due date:
% Done:

0%

Estimated time:

Description

Motivation

New hardware was ordered to serve as openQA workers for o3, both x86_64 and aarch64. We can connect those machines i.e. w27+w28 to the o3 webUI VM instance.

Acceptance criteria

  • AC1: o3 bare-metal jobs run successfully on new PRG2 openQA workers w27/28

Suggestions

  • See #132134 for x86_64 worker setup
  • Discuss with Eng-Infra about the possibility to have the IPMI interfaces of w27+w28 in the same network as system ethernet interfaces
  • Setup w26 as a generic openQA worker host controlling the new w27+w28 bare-metal test machines

Related issues 2 (1 open1 closed)

Related to openQA Infrastructure - action #132647: Migration of o3 VM to PRG2 - bare-metal tests size:MBlockedokurz

Actions
Copied from openQA Infrastructure - action #132134: Setup new PRG2 multi-machine openQA worker for o3 size:MResolveddheidler2023-06-29

Actions
Actions #1

Updated by okurz 9 months ago

  • Copied from action #132134: Setup new PRG2 multi-machine openQA worker for o3 size:M added
Actions #2

Updated by livdywan 9 months ago

  • Subject changed from Setup new PRG2 openQA worker for o3 - bare-metal testing to Setup new PRG2 openQA worker for o3 - bare-metal testing size:M
  • Description updated (diff)
  • Status changed from New to Workable
Actions #3

Updated by okurz 7 months ago

  • Related to action #132647: Migration of o3 VM to PRG2 - bare-metal tests size:M added
Actions #4

Updated by okurz 7 months ago

  • Status changed from Workable to Blocked
  • Assignee set to okurz

For now going with #132647 . In parallel existing machines are moved to PRG.

Actions #5

Updated by okurz 6 months ago

  • Priority changed from Normal to Low
Actions #6

Updated by okurz 3 months ago

  • Target version changed from Ready to Tools - Next
Actions

Also available in: Atom PDF