action #59315

closed

[functional][y] test fails in yast2_lan_restart_devices - The test never worked since it was added to the scenario

Added by SLindoMansilla over 4 years ago. Updated over 4 years ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
Bugs in existing tests
Target version:
SUSE QA - Milestone 30+
Start date:
2019-11-11
Due date:
2019-12-31
% Done:

0%

Estimated time:
Difficulty:

Description

Observation

For TW we have mainly disabled steps as network is controlled by NM.

SLE 15 SP2 is the only affected version (as per comment above).

openQA test in scenario sle-15-SP2-Installer-DVD-x86_64-extra_tests_on_gnome@64bit fails in
yast2_lan_restart_devices

Reproducible

Fails since (at least) Build 27.1

Expected result

Last good: (unknown) (or more recent)

Further details

Always latest result in this scenario: latest

Actions #1

Updated by riafarov over 4 years ago

  • Subject changed from [y] test fails in yast2_lan_restart_devices - The test never worked since it was added to the scenario to [functional][y] test fails in yast2_lan_restart_devices - The test never worked since it was added to the scenario
  • Due date set to 2019-12-03
  • Target version set to Milestone 29

We got new UI in SLE, already did quite some adjustments, need couple of more.
NOTE: changes we did in TW is more like skipping the test, as there network is controlled by NM and not wicked.

Actions #2

Updated by riafarov over 4 years ago

  • Description updated (diff)
  • Status changed from New to Workable
  • Estimated time set to 8.00 h
Actions #3

Updated by riafarov over 4 years ago

  • Due date changed from 2019-12-03 to 2019-12-17
Actions #4

Updated by oorlov over 4 years ago

  • Status changed from Workable to In Progress
  • Assignee set to oorlov
Actions #5

Updated by riafarov over 4 years ago

  • Target version changed from Milestone 29 to Milestone 30+
Actions #6

Updated by riafarov over 4 years ago

  • Due date changed from 2019-12-17 to 2019-12-31
  • Estimated time deleted (8.00 h)

Couple of VRs missing. Almost done.

Actions #8

Updated by oorlov over 4 years ago

  • Status changed from Feedback to Resolved
Actions