Project

General

Profile

Actions

action #57470

open

[sporadic] test fails in user_gui_login

Added by Guillaume_G over 4 years ago. Updated about 1 month ago.

Status:
New
Priority:
Normal
Assignee:
-
Category:
Bugs in existing tests
Target version:
-
Start date:
2019-09-27
Due date:
% Done:

0%

Estimated time:
Difficulty:

Description

Observation

openQA test in scenario opensuse-Tumbleweed-DVD-aarch64-gnome-ext4@aarch64 fails in
user_gui_login

The test fails because we start to type before the window is really ready, so we miss part or all of the gnome-session-quit command line.

Test suite description

Reproducible

Fails since (at least) Build 20190925 (current job)

Expected result

Last good: 20190920 (or more recent)

Further details

Always latest result in this scenario: latest

Actions #1

Updated by Guillaume_G over 4 years ago

One solution could be to use ctrl-alt-del ctrl-alt-L SHORTCUT TO BE DEFINED and use the mouse to click the logout button, as it is done for KDE (and XFCE).
https://github.com/os-autoinst/os-autoinst-distri-opensuse/blob/master/lib/x11utils.pm#L169

It is already done for GNOME on shutdown: https://github.com/os-autoinst/os-autoinst-distri-opensuse/blob/master/lib/power_action_utils.pm#L97

Actions #3

Updated by okurz over 2 years ago

This ticket was set to "Normal" priority but was not updated within the SLO period for "Normal" tickets (365 days) as described on https://progress.opensuse.org/projects/openqatests/wiki/Wiki#SLOs-service-level-objectives . Please consider picking up this ticket within the next 365 days or just set the ticket to the next lower priority of "Low" (no SLO related time period). This update was done as agreed within the SUSE QE Sync call 2021-09-01

Actions #4

Updated by slo-gin over 1 year ago

This ticket was set to Normal priority but was not updated within the SLO period. Please consider picking up this ticket or just set the ticket to the next lower priority.

Actions #5

Updated by slo-gin about 1 month ago

This ticket was set to Normal priority but was not updated within the SLO period. Please consider picking up this ticket or just set the ticket to the next lower priority.

Actions

Also available in: Atom PDF