action #168064

closed

GNOME 47: test fails in ibus_test_cn: add more keyboards dialog changes

Added by dimstar 3 months ago. Updated 15 days ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
Bugs in existing tests
Target version:
-
Start date:
2024-10-10
Due date:
% Done:

100%

Estimated time:
Difficulty:

Description

Observation

We have merged GNOME 47 to Factory. The 'Add keyboard layout' dialog has changed sufficiently (the … no longer being visible by default, needs scrolling)

While I don't think the UI is perfect the way it is (there is no indication that scrolling is even possible), I don't think openQA should fail on this, but rather know how to handle it (as users would be able to do)

openQA test in scenario opensuse-Tumbleweed-DVD-x86_64-gnome-x11-ibus@64bit fails in
ibus_test_cn

Test suite description

Reproducible

Fails since (at least) Build 20241008

Expected result

Last good: 20241007 (or more recent)

Further details

Always latest result in this scenario: latest

Actions #1

Updated by GraceWang 3 months ago

  • Assignee set to GraceWang
Actions #2

Updated by openqa_review 2 months ago

This is an autogenerated message for openQA integration by the openqa_review script:

This bug is still referenced in a failing openQA test: gnome-x11-ibus
https://openqa.opensuse.org/tests/4592265#step/ibus_test_cn/1

To prevent further reminder comments one of the following options should be followed:

  1. The test scenario is fixed by applying the bug fix to the tested product or the test is adjusted
  2. The openQA job group is moved to "Released" or "EOL" (End-of-Life)
  3. The bugref in the openQA scenario is removed or replaced, e.g. label:wontfix:boo1234

Expect the next reminder at the earliest in 28 days if nothing changes in this ticket.

Actions #3

Updated by openqa_review about 1 month ago

This is an autogenerated message for openQA integration by the openqa_review script:

This bug is still referenced in a failing openQA test: gnome-x11-ibus
https://openqa.opensuse.org/tests/4659680#step/ibus_test_cn/1

To prevent further reminder comments one of the following options should be followed:

  1. The test scenario is fixed by applying the bug fix to the tested product or the test is adjusted
  2. The openQA job group is moved to "Released" or "EOL" (End-of-Life)
  3. The bugref in the openQA scenario is removed or replaced, e.g. label:wontfix:boo1234

Expect the next reminder at the earliest in 56 days if nothing changes in this ticket.

Actions #4

Updated by GraceWang 16 days ago

  • Status changed from New to In Progress
  • % Done changed from 0 to 80
Actions #5

Updated by GraceWang 15 days ago

  • Status changed from In Progress to Resolved
  • % Done changed from 80 to 100

PR got merged and latest results show the code change work fine.
We are fine to close this ticket.

Actions

Also available in: Atom PDF