Project

General

Profile

Actions

action #16512

closed

timeout while uploading the logs - test fails in install_and_reboot

Added by dgutu about 7 years ago. Updated about 7 years ago.

Status:
Resolved
Priority:
Urgent
Assignee:
Category:
Infrastructure
Target version:
-
Start date:
2017-02-06
Due date:
% Done:

0%

Estimated time:
Difficulty:

Description

Observation

openQA test in scenario sle-12-SP3-Server-DVD-HA-s390x-ha-ftp@s390x-zVM-vswitch-l3 fails in
install_and_reboot

  • ON the step of uploading the logs after installation the test dies because of timeout. From console its visible that there is some connectivity issue.

Reproducible

Fails since (at least) Build 0064@0234

Expected result

Last good: 0063@0232 (or more recent)

Problem

H1. ACCEPTED: worker specific problem -> E1-1
H2. REJECTED: generic problem in the product failing every time -> E2-1
H3. REJECTED: specific problem in the product failing sometimes under special circumstances
H4. REJECTED: os-autoinst problem

Suggestions

E1-1. check for differences on worker -> O1-1: openqaworker2 ran all jobs that seem to have this problem, and its network seems to have problem -> ACCEPT
E2-1. reproduce locally -> job passed, http://lord.arch/tests/5619#step/install_and_reboot/17 -> REJECT
E3-1. start job of old build in an environment where it fails often -> REJECT
E4-1. check os-autoinst version -> REJECT

Further details

Always latest result in this scenario: latest


Related issues 1 (0 open1 closed)

Related to openQA Project - action #12912: [tools]monitoring of o3/osdResolvedokurz2016-07-28

Actions
Actions

Also available in: Atom PDF