Project

General

Profile

Actions

action #11984

closed

publishing and mirror setup

Added by lnussel over 8 years ago. Updated over 8 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Category:
Infrastructure
Target version:
Start date:
2016-05-15
Due date:
2016-05-19
% Done:

100%

Estimated time:

Description

Set up OBS and Mirror system to handle the new distribution

The ISOs and ftp tree needs to be set to be publish=enabled in OBS.

 <enable arch="local" repository="images"/>

There is a script somewhere on the obs backend that determines what gets pushed where. Adrian or Coolo know. It needs to be adjusted to handle the new distribution.

On pontifex /etc/rsyncd-internal.conf needs to have modules to allow obs to push to the right locations.
Normally the repo and isos are pushed to a -Current directory, when releasing milestones the final location needs to be synced. Watch out for /etc/fstab bind mounting stuff.


Related issues 1 (0 open1 closed)

Copied to openSUSE Leap 42.3 Release - action #14920: publishing and mirror setupClosedadrianSuSE2016-11-282016-12-09

Actions
Actions #1

Updated by lnussel over 8 years ago

  • Description updated (diff)
Actions #2

Updated by lnussel over 8 years ago

  • Description updated (diff)
  • Category set to Infrastructure
Actions #3

Updated by lnussel over 8 years ago

  • Description updated (diff)
Actions #4

Updated by lnussel over 8 years ago

Actions #5

Updated by lnussel over 8 years ago

Actions #6

Updated by lnussel over 8 years ago

  • Description updated (diff)
  • Assignee set to lnussel
  • % Done changed from 0 to 70
Actions #7

Updated by lnussel over 8 years ago

Actions #8

Updated by lnussel over 8 years ago

  • Status changed from New to Closed
  • % Done changed from 70 to 100

done

Actions #9

Updated by lnussel over 8 years ago

  • % Done changed from 100 to 90

non-oss still missing

Actions #10

Updated by lnussel over 8 years ago

  • Status changed from Closed to In Progress
Actions #11

Updated by lnussel over 8 years ago

  • Status changed from In Progress to Closed
  • % Done changed from 90 to 100
Actions #12

Updated by lnussel about 8 years ago

Actions

Also available in: Atom PDF