Project

General

Profile

action #116767

Move test suite rmt_server_install from 'YaST' to 'Migration: Milestone' job group

Added by leli 3 months ago. Updated 18 days ago.

Status:
Resolved
Priority:
High
Assignee:
Target version:
Start date:
2022-09-19
Due date:
% Done:

0%

Estimated time:

Description

Motivation

While reviewing YaST group on build 21.1, the test suite of rmt_server_install failed for RMT as it can't be mirrored before BETA (https://openqa.nue.suse.com/tests/9527513#step/enable_online_repos/1).
So we decided to move this test suite from 'YaST' to 'Migration: Milestone' job group (it is not a migration, but it is the only place where it fits for now, before further reorganization/merge of jobs groups between YaST and Migration scope.

Acceptance criteria

AC1: Move test suite rmt_server_install from 'YaST' to 'Migration: Milestone' job group

History

#1 Updated by leli 3 months ago

  • Tags set to qe-yast-refinement

#2 Updated by JERiveraMoya 2 months ago

  • Description updated (diff)

#3 Updated by JERiveraMoya 2 months ago

  • Subject changed from Move the configuration of rmt_server_install from Yast group to Migration: Milestone group to Move test suite rmt_server_install from 'YaST' to 'Migration: Milestone' job group

#4 Updated by JERiveraMoya 2 months ago

  • Description updated (diff)

#5 Updated by JERiveraMoya 2 months ago

  • Target version set to Current

#6 Updated by coolgw 2 months ago

On the contrary, i think this case can be keep yast group with daily triggered, it can check connectivity of rmt from time to time disregard the milestone time slot.

#7 Updated by zoecao 2 months ago

coolgw wrote:

On the contrary, i think this case can be keep yast group with daily triggered, it can check connectivity of rmt from time to time disregard the milestone time slot.

No, I checked the case rmt_server_install in yast group, it is to install a SLES15SP5 via rmt server. In this situation, it is necessary to move the case to milestone group cause the rmt server only mirror milestone builds.

#8 Updated by JERiveraMoya 2 months ago

  • Description updated (diff)

#9 Updated by JERiveraMoya 2 months ago

  • Priority changed from Normal to High

#10 Updated by JERiveraMoya about 2 months ago

  • Tags deleted (qe-yast-refinement)
  • Status changed from New to Workable

#11 Updated by jgwang about 2 months ago

  • Assignee set to jgwang

#12 Updated by shukui about 2 months ago

  • Status changed from Workable to In Progress

#13 Updated by jgwang about 2 months ago

I created a MR to add "rmt_server_install" into migration milestone group:
https://gitlab.suse.de/coolgw/wegao-test/-/merge_requests/156

and created a MR to delete "rmt_server_install" from YaST group:
https://gitlab.suse.de/qsf-y/qa-sle-functional-y/-/merge_requests/429

#14 Updated by JERiveraMoya about 2 months ago

  • Status changed from In Progress to Resolved

#15 Updated by openqa_review about 1 month ago

  • Status changed from Resolved to Feedback

This is an autogenerated message for openQA integration by the openqa_review script:

This bug is still referenced in a failing openQA test: rmt_server_install
https://openqa.suse.de/tests/9823882#step/enable_online_repos/1

To prevent further reminder comments one of the following options should be followed:

  1. The test scenario is fixed by applying the bug fix to the tested product or the test is adjusted
  2. The openQA job group is moved to "Released" or "EOL" (End-of-Life)
  3. The bugref in the openQA scenario is removed or replaced, e.g. label:wontfix:boo1234

Expect the next reminder at the earliest in 28 days if nothing changes in this ticket.

#16 Updated by jgwang 18 days ago

  • Status changed from Feedback to Resolved

the goal of this ticket just is to move the case "rmt_server_install" from 'YaST' to 'Migration: Milestone' job group, it is not related to the issue in the case "rmt_server_install"

Also available in: Atom PDF