action #109422
closed
[migration] openldap_to_389ds: openldap2 2.5 needs validation
Added by dimstar almost 3 years ago.
Updated over 2 years ago.
Category:
Bugs in existing tests
Description
Observation¶
openQA test in scenario opensuse-Tumbleweed-DVD-x86_64-openldap_to_389ds@64bit fails in
openldap_to_389ds
Openldap2 was updated to 2.5.x - test needs validation, mostly for the used config files
Test suite description¶
ldap_to_389ds tools test
Maintainer: wegao@suse.com
Reproducible¶
Fails since (at least) Build 20220402 (current job)
Expected result¶
Last good: 20220401 (or more recent)
Further details¶
Always latest result in this scenario: latest
- Subject changed from openldap_to_389ds: openldap2 2.5 needs validation to [migration] openldap_to_389ds: openldap2 2.5 needs validation
- Assignee set to coolgw
- Status changed from New to In Progress
First investigation on this case, following error show when do
slapd -h 'ldap:///' -f slapd.conf
susetest:~ # journalctl -f
Apr 06 23:10:16 susetest sshd[8300]: Accepted password for root from 192.168.112.100 port 57888 ssh2
Apr 06 23:11:06 susetest slapd[8375]: @(#) $OpenLDAP: slapd 2.5.9 (Mar 26 2022 00:00:00) $
openldap
Apr 06 23:11:06 susetest slapd[8375]: lt_dlopenext failed: (back_hdb.la) file not found
Apr 06 23:11:06 susetest slapd[8375]: slapd stopped.
Apr 06 23:11:06 susetest slapd[8375]: connections_destroy: nothing to destroy.
Apr 06 23:11:34 susetest slapd[8380]: @(#) $OpenLDAP: slapd 2.5.9 (Mar 26 2022 00:00:00) $
openldap
Apr 06 23:11:34 susetest slapd[8380]: lt_dlopenext failed: (back_hdb.la) file not found
Apr 06 23:11:34 susetest slapd[8380]: slapd stopped.
Apr 06 23:11:34 susetest slapd[8380]: connections_destroy: nothing to destroy.
- % Done changed from 0 to 60
New openldap update lead some change both on openqa script and 389 migration tools.
With William's help we found one issue, and William give following PR for fix on 389 side.
https://github.com/389ds/389-ds-base/pull/5261
At the same time i will submit PR for update current openqa script.
- Status changed from In Progress to Feedback
wait final result, openqa PR already merge, wait a good result then we can close it.
- % Done changed from 60 to 80
- Estimated time set to 20.00 h
- Status changed from Feedback to Resolved
Also available in: Atom
PDF