1 15 okurz
# Introduction
2 1 okurz
3 15 okurz
{{toc}}
4
5 1 okurz
Also see https://progress.opensuse.org/projects/openqav3/wiki
6
7 20 okurz
8
# Organisational
9
10
## ticket workflow
11
12 21 okurz
This project adheres to the ticket workflow as described on the parent project: [ticket workflow](https://progress.opensuse.org/projects/openqav3/wiki/Wiki#ticket-workflow)
13 20 okurz
14
Also see the [[Wiki#Definition-of-DONE|Definition-of-DONE]] on the use of ticket status, especially when to set *Resolved*.
15
16 35 okurz
The following issue categories are used:
17
18
* *New test*: Any extension of the existing test coverage, for example a new test module, a new test scenario as well as simply an addition of test steps within existing test modules
19 37 okurz
* *Bugs in existing tests*: Test failures that need to be investigated or obvious test failures which need fixing in the test codes or needle updates; **not** product bugs: Necessary adaptions to existing tests to make them usable again after acceptable product changes or to increase stability of unstable tests
20
* *Enhancement to existing tests*: Enhancements without changing the test scope, for example improvement of post_fail_hooks to gather more relevant logs, refactoring, cleanup of code, reducing duplication, make tests more stable, refactor to be easier to read, workflow related
21
* *Infrastructure*: Anything regarding the test infrastructure including workers used for o3 (openqa.opensuse.org) and osd (openqa.suse.de). Not directly related to the test code or needles but our infrastructure, e.g. worker issues, our syncing and triggering approach, etc.
22 38 szarate
* *Spike/Research*: Tickets that represent a timeboxed research of some sort, or also [a spike](http://agiledictionary.com/209/spike/) with the sole intention of clarifying before spawning new tasks on a certain topic.
23 20 okurz
24 15 okurz
# test organization on https://openqa.suse.de/
25 1 okurz
26 15 okurz
## job group names
27 1 okurz
28 15 okurz
### Job group names should be consistent and structured for easy (daily) review of the current status
29 1 okurz
30
template:
31
```
32
<product_group_short_name> <order_nr>.<product_variant>
33
```
34
e.g. "SLE 12 SP1 1.Server". Keep the whitespace for separation consistent, also see https://progress.opensuse.org/issues/9916
35
36 15 okurz
### Released products should be named with a prefix 'x' to show up late in the overview page
37 1 okurz
38 2 okurz
This way we can keep track if tests fail even though the product does not produce new builds. This could help us crosscheck tests. E.g. "x-released SLE 12 SP1 1.Server".
39 1 okurz
40 2 okurz
lowercase "x" as all our product names start with capital letters. Sorting works regardless (or uppercase first?).
41 1 okurz
42
For now we do not retrigger tests on old builds automatically but any test developer may retrigger it manually, e.g. if he suspects the tests broke and he wants to confirm that local changes are not at fault.
43 4 okurz
44 15 okurz
# needling best practices
45 14 okurz
There are also other locations where "needling best practices" can be found but we should also have the possibility to keep something on the wiki. Feel free to contact me (okurz) and tell me where it should be instead if there is a better place. Also look into [openQA Pitfalls](https://github.com/os-autoinst/openQA/blob/master/docs/Pitfalls.asciidoc)
46 4 okurz
47 15 okurz
## applying "workaround" needles
48 4 okurz
If a test reveals a product issue of minor importance it can make sense create a needle with the property "workaround" set. This way, if the needle is matched, the test records this as a "soft-fail". To backtrack the product issue and follow on this and eventually delete the workaround needle if the product issue is fixed, the product issue should be recorded in the needle name itself and at best also in the git commit message adding the needle. If test changes are necessary the source code should have a corresponding comment referencing the issue as well as marking start and stop of the test procedure that is necessary for applying the workaround. Example for a needle name: "gdm-workaround-bsc962806-20160125" referencing bsc#962806
49 1 okurz
50
*keep in mind:*
51 33 okurz
Since [gh-os-autoinst#532](https://github.com/os-autoinst/os-autoinst/pull/532) workaround needles are always preferred, otherwise if two needles match, the first in alphabetical list wins. Therefore it is even more important to prevent "greedy" needles, i.e. make sure the workaround needles do not match without checking for the error condition
52 5 okurz
53 15 okurz
## do not overwrite old needles because old date confuses people
54 19 okurz
With the needle editor a timestamp of the current day is automatically added to new needles. When updating a needle, don't overwrite a needle with the old date tag not to confuse people as it will look really weird in the needle editor.
55 8 okurz
56 15 okurz
## needle indidvidual column entries in tables
57 8 okurz
**Problem**: Tables might auto-adjust column size based on content. Therefore it is unsafe to create needles covering multiple columns in a row. Failing example: https://openqa.suse.de/tests/441169#step/yast2_snapper/23
58
**Solution**: Needles support multiple areas. Use them to needle individual cells in this example.
59 6 okurz
60 17 okurz
61
## don't include version specific content in needles
62
63
**Problem**: Creating a needle that covers version number of application or product version fails often for every update, e.g. see [opensuse-42.2-DVD-x86_64-Build0112-xfce@64bit](https://openqa.opensuse.org/tests/228793#step/firefox/10). Obviously the needle does not match because no one so far created a needle for firefox 47 on Leap42.2 on xfce.
64
**Solution**: openQA in general supports exclusion areas and even OCR but they have its [flaws](https://progress.opensuse.org/issues/12858). For now better carefully select matching areas so that versions are not included like in the following example
65
![needling example](openQA_needle_firefox_wo_version_cropped.png).
66
67 15 okurz
# Definition of DONE/READY
68 6 okurz
69
Each of the following points has to be fulfilled to regard individual contributions as *DONE*. Not every step has to be done by the same step. The overall completion is in responsibility of the complete team.
70
71 15 okurz
## Definition of DONE
72 6 okurz
73
Also see http://www.allaboutagile.com/definition-of-done-10-point-checklist/ and https://www.scrumalliance.org/community/articles/2008/september/what-is-definition-of-done-%28dod%29
74
75
The following definitions are used to ensure development on individual tests has been completed covering all existing different workflows, e.g. covering "hot-fixes" on the productive instance as well as contributions by new contributors with no previous experience and no control over needle generation on productive instances.
76
77 1 okurz
* Code changes are made available via a pull request on the github repository
78 6 okurz
* New tests as individual test modules (i.e. files under `tests/`): They are loaded in main.pm of sle and/or opensuse 
79
* "make test" works (e.g. automatic travis CI check triggered on each github PR)
80
* [Guidelines for git commits](http://chris.beams.io/posts/git-commit/) have been followed
81
* Code has been reviewed (e.g. in the github PR)
82
* Favored, but depending on criticality/complexity/size: A local verification test has been run, e.g. post link to a local openQA machine or screenshot or logfile
83 18 okurz
* Test modules that have been touched have updated metadata, e.g. "Maintainer" and "Summary" (#13034)
84 28 okurz
* Potentially impacted product variants have been considered, e.g. openSUSE, SLE, validation tests for new product versions currently in development, maintenance tests on older product versions
85 6 okurz
* Code has been merged (either by reviewer or reviewee after 'LGTM' from others)
86 1 okurz
* Code has been deployed to osd and o3 (automatic git sync every few minutes)
87
* If new variables are necessary (feature toggles): A test_suite is executing the test, e.g. test_suite is created or variable is added to existing test_suite over web interface configuration on osd and/or o3
88 31 okurz
* If a new test_suite has been created:
89
  * The test_suite is added to at least one job_group
90
  * The test_suite has a description describing the goal of the new test + at least one maintainer. Optional: References to fate#, boo#, bsc#, poo#
91 6 okurz
* Necessary needles are made available as PR for sle and/or opensuse (depending if executed, see above for 'main.pm') or are created on the productive instance
92 29 okurz
* At least one successful test run has been observed on osd or o3 and referenced in the corresponding progress item or bugzilla bug report if one exists. There is one exception: If the test fails in a valid product bug and it is expected that a bug fix will be provided shortly the test run may also fail when labeled accordingly.
93 6 okurz
94 15 okurz
## Definition of READY for new tests
95 6 okurz
96
The following points should be considered before a new test is READY to be implemented:
97
98
* Either a product bug has been discovered for which there is no automated test in openQA or a FATE request for new features exists
99
* A test case description exists depicting the prerequisites of the test, the steps to conduct and the expected result
100
* The impact and applicability for both SLE and openSUSE products has been considered
101 10 okurz
102 30 okurz
a good practice is to also add the following one after another:
103
* a tag in the subject line of either "[easy]", "[medium]", "[hard]" depending on how you judge the implementation of the ticket in comparison to other known examples from experience. E.g. a simple "needle update" should be "[easy]" as well as changes to only one test module. A change that would involve updating the test API, needles and test code and impacting multiple products can be "[hard]"
104
* add acceptance criteria (see ticket template)
105
* add tasks as a hint where to start
106
107 39 SLindoMansilla
## ticket backlog triaging
108 24 okurz
109 34 okurz
Also see https://progress.opensuse.org/projects/suseqa/wiki#ticket-refinement-grooming
110 24 okurz
111
112 27 okurz
1. [**Categorize**](https://progress.opensuse.org/projects/openqatests/issues?utf8=%E2%9C%93&set_filter=1&f%5B%5D=category_id&op%5Bcategory_id%5D=%21*&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=&c%5B%5D=subject&c%5B%5D=project&c%5B%5D=status&c%5B%5D=assigned_to&c%5B%5D=fixed_version&c%5B%5D=relations&c%5B%5D=priority&c%5B%5D=updated_on&c%5B%5D=category&c%5B%5D=created_on&group_by=): Goal -> No ticket without category
113
2. [**Tag**](https://progress.opensuse.org/projects/openqatests/issues?utf8=%E2%9C%93&set_filter=1&f%5B%5D=subject&op%5Bsubject%5D=%21%7E&v%5Bsubject%5D%5B%5D=%5B&f%5B%5D=status_id&op%5Bstatus_id%5D=o&f%5B%5D=&c%5B%5D=subject&c%5B%5D=project&c%5B%5D=status&c%5B%5D=assigned_to&c%5B%5D=fixed_version&c%5B%5D=relations&c%5B%5D=priority&c%5B%5D=updated_on&c%5B%5D=category&group_by=): Goal -> No ticket without component or responsibility tags
114 23 okurz
115
# code contribution review checklist
116
117
Check each pull request on https://github.com/os-autoinst/os-autoinst-distri-opensuse against the following rules
118
119
* https://github.com/os-autoinst/os-autoinst-distri-opensuse#coding-style
120
* DoD is adhered to
121
* SLE staging impact has been considered (be careful accepting changes during working days when a stable SLE staging project is expected by release managers)
122
123
124 15 okurz
# Test development instances (staging openQA instances)
125 10 okurz
126 1 okurz
Contributors cannot afford to verify a newly developed test in all scenarios run by o3 or osd, so tests will break sometime. It would be useful to use a machine to run a subset of the scenarios run in the official instance(s) to make sure the new tests can be deployed with some degree of confidence. But: Any "staging openQA instance" would not be able to run everything which is run in production. It just does not scale. So anyway only a subset can be run and there can be always something missing. Also, we don't have the hardware capacity to cover everything twice and also consider SLE plus openSUSE. Our [DOD](https://progress.opensuse.org/projects/openqatests/wiki/Wiki#Definition-of-DONEREADY) should cover some important steps so that external contributors are motivated to test something locally first. We have a good test review process and it has to be decided by the reviewer if he accepts the risk of a new test with or without a local verification and covering which scenarios. Depending on the contributors it might make sense to setup a staging server with a subset of tests which is used by multiple test developers to share the burden of openQA setup and administration. For example the YaST team has one available: https://wiki.microfocus.net/index.php/YAST/openQA
127 11 okurz
If you want to follow this model you can watch [this talk by Christopher Hofmann from the OSC16](https://events.opensuse.org/conference/oSC16/program/proposal/986) or ask the YaST team for their experiences.
128 16 okurz
129
# Tips for test development and issue investigation
130
131
Examples mentioned here write `clone_job` and `client`. Replace this by a call to the scripts within openQA installation with the corresponding name and proper arguments to provide your API key as well as the host selection, e.g. `/usr/share/openqa/client --host https://openqa.opensuse.org` with your API key configured in `~/.config/openqa/client.conf`
132
133
## Uploading image files to openqa server and run test on it
134
135
You can manually trigger a test job with explicit name as one-shot overriding the variables as necessary, for example:
136
137
as geekotest@openqa:
138
139
```
140
cd /var/lib/openqa/factory/hdd
141
wget http://<my_host>/<path>.qcow2 -O <new_image_name>.qcow2
142
cd /var/lib/openqa/factory/iso
143
/usr/share/openqa/script/client isos post --params SLE-12-SP2-Server-DVD-ppc64le-Build1651-Media1.iso.6.json HDD_1=SLE-12-Server-ppc64le-GM-gnome_with_snapper.qcow2 TEST=migration_offline_sle12_ppc BUILD=1651_<your_short_name>
144
```
145
146
why `SLE-12-SP2-Server-DVD-ppc64le-Build1651-Media1.iso.6.json`? I checked `SLE-12-SP2-Server-DVD-ppc64le-Build1651-Media1.iso.?.json`: There are `…5…` and `…6…`. `…5…` is for *HA* so I chose 6.
147
148
The job can be cleaned afterwards to tidy up the build history with:
149
150
```
151
client jobs/463859 delete
152
```
153
154
## Create new HDD image with openQA
155
```
156
client jobs post DISTRI=sle VERSION=12 FLAVOR=Server-DVD ARCH=ppc64le BACKEND=qemu \
157
NOVIDEO=1 OFW=1 QEMUCPU=host SERIALDEV=hvc0 BUILD=okurz_poo9714 \
158
ISO=SLE-12-Server-DVD-ppc64le-GM-DVD1.iso INSTALLONLY=1 QEMU_COMPRESS_QCOW2=1 \
159
PUBLISH_HDD_1=SLES-12-GM-gnome-ppc64le_snapper_20g.qcow2 TEST=create_gm_ppc_image \
160
MACHINE=ppc64le WORKER_CLASS=qemu_ppc64le HDDSIZEGB=20 MAX_JOB_TIME=86400 TIMEOUT_SCALE=10
161
```
162
163
The `MAX_JOB_TIME=86400 TIMEOUT_SCALE=10` allows for interactive login during the process in case you want to manually adjust or debug. Beware though that `TIMEOUT_SCALE=10` also scales the waiting time on `check_screen` so that the whole job might take longer to execute.
164
165
To run a test but based on the new HDD image search for a good example and clone it with adjusted parameter:
166
167
```
168
clone_job 462022 HDD_1=SLES-12-GM-gnome-ppc64le_snapper_20g.qcow2
169
```
170
171
## Interactive investigation
172
173
While a job is running one can connect to the worker (if network access is possible) using VNC. One challenge is that the test is still running and manual interaction with the system interferes with the test and vice versa.
174
175
176
### Making the test stop for long enough to be able to connect
177
178
If you can change the test code, i.e. if running on a development machine, you can for example add a `sleep 3600;` or `wait_serial 'CONTINUE';` at the point in test when you want to connect to the system and interact with it, e.g. to gather additional logs. In case of `wait_serial 'CONTINUE';` you can echo 'CONTINUE' to the serial point to let the test continue, e.g. call `echo 'CONTINUE' > /dev/ttyS0;`.
179
180
In case you can not or do not want to change the test code or your test run is stopping anyway at a certain point with long enough timeout you can also increase timeout with `TIMEOUT_SCALE`, e.g. trigger it with the job variable `TIMEOUT_SCALE=10`. For example a `script_run` with default timeout of 90 seconds will wait for 900 seconds (=15 minutes) which should give enough time in most cases already.
181 1 okurz
182 26 okurz
Other possibility is to enter the interactive mode using the Interactive mode button on "Live view" tab of job run and then stop the execution. After that the qemu VM will enter debug mode.
183 25 riafarov
184
### Making VM active again
185 26 okurz
In case of interactive mode usage, as mentioned above, VM will get to debug mode and freeze. To make VM interactive again, we need to send the 'cont' command over qemu HMP.
186
To perform these activity within the o3 infrastructure, multiple steps are required:
187 25 riafarov
1) Request adding your ssh public key to access o3
188 26 okurz
2) Connect to o3 using the following command:
189 25 riafarov
190
```
191
ssh o3
192 1 okurz
```
193 26 okurz
3) Now you will be able to connect as root to the worker of your choice using ssh
194
4) Use 'ps' to find relevant qemu VM instance and get the qemu telnet monitor port. Hint: you can use the vnc port shown when cursor is on the worker's name on job page, e.g.:
195 25 riafarov
196
```
197
ps aux | grep :91
198 1 okurz
```
199 26 okurz
5) Connect to the VM using VNC (see next section)
200
6) Connect to the VM monitor using telnet:
201 25 riafarov
202
```
203
telnet localhost 20072
204
```
205 26 okurz
7) Type the `cont` command to continue:
206 25 riafarov
207
```
208
cont
209 1 okurz
```
210 25 riafarov
211
NOTE: please use '^]' as escape character, detach will stop VM.
212
213 1 okurz
### VNC port forwarding
214 26 okurz
After configuring the ssh profile for connection to o3, it's possible to perform port forwarding using ssh using following command:
215 25 riafarov
216
```
217
ssh -L <local_port_number>:<worker_hostname>:<vnc_port_on_remote_host> -NT4f o3
218
```
219
220
For example:
221
222
```
223
ssh -L 5997:openqa-worker:5997 -NT4f o3
224
```
225
226 26 okurz
After that you can connect to this port using VNC.
227 16 okurz
228
### Connecting over VNC
229
230 26 okurz
The VNC port is shown on the job live view as a hover text on the instance name. Make sure to use a "shared" connection in your vncviewer. `krdc`, the default KDE VNC viewer, as well as `vinagre`, default GNOME VNC viewer, do this already. For TigerVNC use for example:
231 16 okurz
232
```
233
vncviewer -Shared malbec.arch:91
234
```
235
236
237
### Forwarding of special shortcuts
238
239
The default `vncviewer` in openSUSE/SUSE systems is recommended as it can also be used to forward special keyboard shortcuts. E.g. to change to text console:
240
Press *F8* in vncviewer, select *ctrl* and *alt* in menue, exit menue, press *F2*.
241
242
243
### Requesting video when by default you do not have video in your environment
244
245
Example:
246
247
```
248
clone_job 464665 NOVIDEO=0
249
```
250 22 okurz
251
## Structured test issue investigation
252
253
In the cases of non-trivial issues it makes sense to use the "scientific method" especially because openQA tests being system tests are under influence of many moving parts. Also see https://progress.opensuse.org/projects/openqav3/wiki#Further-decision-steps-working-on-test-issues about this.
254 1 okurz
[Bug Hunting and the Scientific Method](https://accu.org/index.php/journals/1714) is a suggested read as well as [How to Fix the Hardest Bug You've Ever Seen: The Scientific Method](http://yellerapp.com/posts/2014-08-11-scientific-debugging.html). It is suggested to note down in tickets the hypotheses of all potential relevant problem sources, design experiments - which can be as simple as checking the logfile, collect observations, accept/reject hypotheses and therefore derive a better understanding of what is happening to eventually come to a conclusion. [s390 dasdfmt fails even though command looks complete in screenshot](https://progress.opensuse.org/issues/12410) can serve as an real-world example ticket how it can look like.
255 32 okurz
256
## Statistical investigation
257
258
In case issues appear sporadically and are therefore hard to reproduce it can help to trigger many more jobs on a production instance to gather more data first, for example the failure ratio.
259
260
A script like [openqa_clone_job_o3](https://github.com/okurz/scripts/blob/master/openqa_clone_job_o3) can help. Example of triggering 100 jobs in the development group so that the result of passed/failed jobs is counted by openQA itself on the corresponding overview page:
261
262 1 okurz
```
263 36 okurz
for i in {001..100} ; do openqa_clone_job_o3 --skip-chained-deps 123456 TEST=okurz_poo32242_$i BUILD=poo32242_investigation _GROUP="Test Development: openSUSE Tumbleweed" ; done
264 1 okurz
```
265 32 okurz
266 40 szarate
Alternatively, there's another script: https://github.com/foursixnine/stunning-octo-chainsaw/blob/master/openQA/trigger-multiple-jobs
267
268
Both alternatives will make the results visible on https://openqa.opensuse.org/tests/overview?build=poo32242_investigation