Project

General

Profile

action #107320

Updated by apappas about 2 years ago

## Observation 
 ssh connection is consistently dropping between the SUT and 

 openQA at prepare_test_data, preventing further tests.  

 openQA test in scenario sle-15-SP4-Online-s390x-extra_tests_gnome@s390x-kvm-sle12 fails in 
 [prepare_test_data](https://openqa.suse.de/tests/8207530/modules/prepare_test_data/steps/10) 

 ## Test suite description 
 Maintainer: QE Core, asmorodskyi. Extra tests which were designed to run on gnome , VNC_STALL_THRESHOLD is needed for xen svirt to don't turn off the scrreen after default 4 sec 

 New version of extra_tests_on_gnome for yaml scheduling 

 ## Acceptance Criteria  
 * **AC0:** Investigate if this test can be unscheduled. Tests may be able or already are downloading the necessary test data themselves. No need to download unneeded data. 
 * **AC1:** Make sure that the ssh console is necessary for s390, given that we have a working serial console 
 * **AC2:** Investigate if it is a backend/hardware problem with grenache/s390 machine 
 * **AC3:** Investigate if the problem is caused by the choice of `user-console` 

 


 ## Reproducible 

 Fails since (at least) Build [61.1](https://openqa.suse.de/tests/7618963) 


 ## Expected result 

 Last good: (unknown) (or more recent) 


 ## Further details 

 Always latest result in this scenario: [latest](https://openqa.suse.de/tests/latest?arch=s390x&distri=sle&flavor=Online&machine=s390x-kvm-sle12&test=extra_tests_gnome&version=15-SP4) 

Back