## Observation 

 For a while we've seen that there are jobs that do a full installation (including the reboot) only to run couple of extra tests post installation, the problem with this approach is that if a test happens to fail during the installation, or a module that is not the one needed (say consoletest_setup) the time spent during the installation is basically lost. 

 It's better to identify those scenarios, leaving only `default` in a state where it runs a very limited subset of tests right after the install without any workarounds that we apply to carry on with testing 

 ## Suggestions 

 * Take a look at the jobs in sle functional jobgroup see which jobs are doing installation + extra work, try to change that to Boot to desktop + extra work in the schedule 
 * Repeat above step (if makes sense) on TW. 
 * Cleanup Development 15, job group 

 ### Caveats: 

 * PPC (powerKVM) supports qcow images too, those can be considered 
 * For powerVM, spvm this is not possible unless START_AFTER_TEST is used (but can only be used once, or with a good chain of tests) once) 
 * This is also not possible for z/VM, but possibly can be done with START_AFTER_TEST z/VM 
 * Possibly job group storage will need to be updated. 