Actions
report #539
closedCreate a report of the develom,ent sprint
Status:
Closed
Priority:
Normal
Assignee:
Category:
Documentation
Target version:
Start date:
2013-06-17
Due date:
2013-06-19
% Done:
0%
Estimated time:
2.00 h
Description
The report should look like the followin:
- No more than two pages of content.
- It should refer to the management tool.
- Table of contents ** Justification ** Goals ** Sprint description *** Milestones and most relevant actions *** Timneline *** Resources *** ** Conclusions *** General vision of improvements and downsides *** General conclusion about the sprint itself *** Impact in Factory/openSUSE/SLE12 *** Work needed for the future and limitations
If the contents referred are not in the management tool or hard to find, means that need to be explainied in the tool wiki, so the contents can be referred in the report.
Actions