Project

General

Profile

Actions

action #34813

closed

[microos] tests for caasp toolchain module

Added by thehejik about 6 years ago. Updated almost 6 years ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
New test
Target version:
-
Start date:
2018-04-12
Due date:
% Done:

100%

Estimated time:
4.00 h
Difficulty:

Description

According to PRD document for CaaSP 3.0 we should test Toolchain module/add-on in CaaSP 3.0 for kernel debugging purposes.

  • The module will be distributed for end users as a new SCC channel for CaaSP 3 over SUSEConnect (online SCC repo only, no DVD)
  • Thorsten wants to test installing of KMP kernel modules (like Nvidia) and little debugging with strace, gdb, (tcpdump)
  • URI of the module in IBS is SUSE:Products:SUSE-CaaSP-Toolchain:3:x86_64

Trello card from SCC team https://trello.com/c/LL8lkF4E/91-caasp3-toolchain-module (card in current sprint so it should be ready soon)

The card has been marked as done today 18.4.2018.

We have discussed the workflow with aherzig:

  • user will register CaaSP by using SUSEConnect -r
  • after registering there should be free toolchain extension available in SUSEConnect -l output: AVAILABLE EXTENSIONS AND MODULES

FREE EXTENSIONS

SUSE CaaS Plattform Toolchain 3.0 x86_64
Install with: SUSEConnect -p caasp-toolchain/3.0/x86_64

MORE INFORMATION

You can find more information about available modules here:
https://www.suse.com/products/server/features/modules.html

  • register Toolchain module by calling SUSEConnect -p caasp-toolchain/3.0/x86_64
  • install tcpdump|gcc|gdb|strace
Actions #1

Updated by thehejik about 6 years ago

  • Description updated (diff)
Actions #2

Updated by thehejik about 6 years ago

  • Description updated (diff)
Actions #3

Updated by okurz almost 6 years ago

  • Category set to New test
Actions #4

Updated by thehejik almost 6 years ago

  • Status changed from New to In Progress
  • Assignee set to thehejik
  • Estimated time set to 4.00 h
Actions #6

Updated by thehejik almost 6 years ago

  • Status changed from In Progress to Resolved
  • % Done changed from 90 to 100
Actions

Also available in: Atom PDF