Project

General

Profile

Actions

action #176547

open

[MinimalVM] Schedule test runs for MinimalVM on Leap

Added by ph03nix 2 months ago. Updated 7 days ago.

Status:
In Progress
Priority:
High
Assignee:
Target version:
-
Start date:
2025-02-04
Due date:
% Done:

0%

Estimated time:

Description

The Leap test runs on openqa.opensuse.org do not test MinimalVM. This means bugs like https://bugzilla.opensuse.org/show_bug.cgi?id=1236785 are not detected.

We should schedule at least the main group from the MinimalVM tests, preferrably all MinimalVM test runs for Leap.

We should not focus on Leap 15.6 anymore and immediately target Leap 16.

Acceptance criteria

  • AC1 MinimalVM test runs are scheduled for Leap 16
Actions #1

Updated by ph03nix about 2 months ago

  • Priority changed from Normal to High
Actions #2

Updated by slo-gin 28 days ago

This ticket was set to High priority but was not updated within the SLO period. Please consider picking up this ticket or just set the ticket to the next lower priority.

Actions #3

Updated by mdati 7 days ago

  • Status changed from Workable to In Progress
  • Assignee set to mdati
Actions

Also available in: Atom PDF