SLE 15 SP6 PublicRC - RMT/SMT/SCC status check and Milestone build triggering

Added by JERiveraMoya 28 days ago. Updated 19 days ago.

Status:
Resolved
Priority:
High
Assignee:
Target version:
-
Start date:
2024-04-19
Due date:
% Done:

0%

Estimated time:

Description

Motivation

In order to test scenarios using RMT/SMT/SCC in openQA we need to take serveral actions regarding automation.

Scope

Corresponding milestone Build.

Acceptance criteria

AC1: First of all, verify if RMT regression manual testing is required by checking the version and only if so, notify the squad.
AC2: Perform necessary checks of RMT/SMT/SCC to ensure products in milestone are synced to updates.suse.com
AC3: Trigger with isos post the milestone build for job group Migration: Milestone

Additional information

openQA review is not included in this ticket, for that we follow normal rotation in the squad.
Example of ticket for AC1 is #156610, but ensure there is a ticket on that epic for someone else to cover this in the squad before proceeding with this ticket.