Actions
action #159060
opencoordination #155182: [epic] Participate in alpha-testing of new version of velociraptor-client
Rollback/switch to officially installed velociraptor-client repo and server size:S
Start date:
2024-02-08
Due date:
% Done:
0%
Estimated time:
Tags:
Description
Motivation¶
#155179 is done. Crosscheck with the velociraptor-client development team and rollback our salt managed machines to use official packages and the non-development server again
Acceptance Criteria¶
- AC1: salt-controlled machines use the stable velociraptor repo
## Suggestions
- Look at https://gitlab.suse.de/openqa/salt-pillars-openqa/-/merge_requests/736 for previous changes
- Clarify which repo to use, see https://suse.slack.com/archives/C02NJAA1PEC/p1713696437484159
https://download.suse.de/ibs/SUSE:/Velociraptor/15.5/ only offers x86_64. I thought we should use that repo unconditionally but what about aarch64, s390x, ppc64le? Until we found a better place to install aarch64/ppc64le/s390x Leap 15.5 packages from I will revert to the official Leap repository content. Soon we will upgrade to Leap 15.6 anyway
- Check that we use the correct endpoint
Actions