Project

General

Profile

Actions

action #156409

closed

coordination #155809: [epic] Refocus regarding HPC testing

Select the correct migration target product when there are multiple options

Added by zoecao 2 months ago. Updated about 1 month ago.

Status:
Rejected
Priority:
Normal
Assignee:
-
Target version:
-
Start date:
2024-03-01
Due date:
% Done:

0%

Estimated time:

Description

Motivation

I file this ticket because the migration paths from HPC15SP3/SP4/SP5 to HPC15SP6 is not removed from SCC, [see comments here]. So need to adapt the automation codes that choose the correct migraiton targe product.

It happens that there are multiple options of migration target products on online migration cases, if the correct target product is not listed on the top, then need to send key "down" or choose the correct product number to chose target product. See the jobs below:
Online migration by "yast2 migraiton":
https://openqa.suse.de/tests/13644355#step/yast2_migration/4
We aim to make it migrate to SLES15SP6, not HPC15SP6, need to make it send key "down" and then next.
Online migration case via "zypper migration":
https://openqa.suse.de/tests/13644270#step/zypper_migration/4
In this situation, need to choose number 2 to make it migrate to SLES15SP6.

Acceptance criteria

AC1 : Adapt the code to choose the correct migration target product for both "zypper migraiton" and "yast2 migration"

Actions #1

Updated by openqa_review about 2 months ago

This is an autogenerated message for openQA integration by the openqa_review script:

This bug is still referenced in a failing openQA test: migr_slehpc15sp5
https://openqa.suse.de/tests/13784843#step/check_os_release/1

To prevent further reminder comments one of the following options should be followed:

  1. The test scenario is fixed by applying the bug fix to the tested product or the test is adjusted
  2. The openQA job group is moved to "Released" or "EOL" (End-of-Life)
  3. The bugref in the openQA scenario is removed or replaced, e.g. label:wontfix:boo1234

Expect the next reminder at the earliest in 28 days if nothing changes in this ticket.

Actions #2

Updated by JERiveraMoya about 2 months ago

  • Tags set to qe-yam-apr-sprint
  • Status changed from New to Workable
  • Parent task set to #155809

@zoecao do you know when is expected the cleanup of HPC as product in SLE 15 SP6 so we don't need this.
In the meantime I will schedule for next sprint.

Actions #3

Updated by zoecao about 2 months ago

JERiveraMoya wrote in #note-2:

@zoecao do you know when is expected the cleanup of HPC as product in SLE 15 SP6 so we don't need this.
In the meantime I will schedule for next sprint.

The HPC15SP6 was cleanup yesterday.

Actions #4

Updated by leli about 1 month ago

There is no such SLEHPC 15SP6 target in latest test results, https://openqa.suse.de/tests/13891127#. While the test code issue is still there, it shouldn't select the 1st one as default, it should update the condition to select the correct num depending the output.

Actions #5

Updated by tinawang123 about 1 month ago

  • Status changed from Workable to In Progress
  • Assignee set to tinawang123
Actions #6

Updated by tinawang123 about 1 month ago

  • Status changed from In Progress to Workable

As no job failed by this ticket.
The jobs can select correct product now.
I will release this ticket.

Actions #7

Updated by tinawang123 about 1 month ago

  • Assignee deleted (tinawang123)
Actions #8

Updated by JERiveraMoya about 1 month ago

  • Status changed from Workable to Rejected
Actions

Also available in: Atom PDF