Project

General

Profile

Actions

action #154708

closed

coordination #130075: [epic] Milestone testing for SLE 15 SP6

SLE 15 SP6 PublicBeta - RMT/SMT/SCC status check and Milestone build triggering

Added by JERiveraMoya 10 months ago. Updated 9 months ago.

Status:
Resolved
Priority:
Normal
Target version:
-
Start date:
2023-12-11
Due date:
% Done:

0%

Estimated time:

Description

Motivation

In order to test scenarios using RMT/SMT/SCC in openQA we need to take serveral actions regarding automation.

Scope

Corresponding milestone Build.

Acceptance criteria

AC1: First of all, verify if RMT regression manual testing is required by checking the version and only if so, notify the squad.
AC2: Perform necessary checks of RMT/SMT/SCC to ensure products in milestone are synced to updates.suse.com
AC3: Trigger with isos post the milestone build for job group Migration: Milestone

Additional information

openQA review is not included in this ticket, for that we follow normal rotation in the squad.
Example of ticket for AC1 is #156610, but ensure there is a ticket on that epic for someone else to cover this in the squad before proceeding with this ticket.

Actions #1

Updated by JERiveraMoya 9 months ago

  • Description updated (diff)
Actions #2

Updated by JERiveraMoya 9 months ago

  • Description updated (diff)
Actions #3

Updated by JERiveraMoya 9 months ago

  • Tags set to qe-yam-mar-sprint
  • Status changed from New to Workable
Actions #4

Updated by syrianidou_sofia 9 months ago

  • Status changed from Workable to In Progress
  • Assignee set to syrianidou_sofia
Actions #5

Updated by JERiveraMoya 9 months ago

Please, notify reviewers when triggered successfully.

Actions #6

Updated by JERiveraMoya 9 months ago ยท Edited

Although it is Normal priority, please prioritize this one so we can file bugs asap with fresh milestone.
I prefer to not set it as High because that would be an artificial priority (confusing the squad and we are not even asked by other stakeholders by this),
however it makes sense to do it soon after Reg server is ready.

Actions #7

Updated by JERiveraMoya 9 months ago

  • Status changed from In Progress to Resolved
Actions

Also available in: Atom PDF