Project

General

Profile

Actions

action #137570

closed

Don't include the MU patchs when publishing the support images for sle12sp5+HA

Added by rfan1 8 months ago. Updated 7 months ago.

Status:
Resolved
Priority:
High
Assignee:
Target version:
Start date:
2023-10-07
Due date:
% Done:

0%

Estimated time:

Description

Motivation

Many sle12sp5+HA migration tests failed, take below one as an example
patch_sle

The qcow2 images are from another job group 12sp5-ha
However, the job which publishes the qcow2 image may have some problems since it try to install the MU patches during the test https://openqa.suse.de/tests/12404324
Need confirm whether the 'SCC_ADDONS = sdk,tcm,wsm,we,contm,asmm' that each addon for installation is needed or not.

the below test is included in schedule file, which is not expected. [we don't cover the MU patches during the qcow2 image creating phase]
- qa_automation/patch_and_reboot

We should fix the test steps for publishing qcow2 image job at first.

Acceptance criteria

AC1 : Fix the test steps for jobs publish the qcow2 images at job group
AC2 : Need confirm whether each addon for HA installation is needed or not.
AC3 : Run VRs with the qcow2 images to make sure the images can work fine

Further details

Always latest result in this scenario: latest

Actions

Also available in: Atom PDF