closed

coordination #130216: [epic] Adapt migration test coverage and its migration matrix for SLE 15 SP6

Cleanup migration test from SLE12-SP5

Added by leli 8 months ago. Updated 7 months ago.

Status:
Resolved
Priority:
High
Assignee:
Target version:
Start date:
2023-09-12
Due date:
% Done:

0%

Estimated time:

Description

Motivation

After all tickets on optimizing migration from SLE12-SP5 in #130216 are resolved, we need to perform a final cleanup for those tests doing a migration from SLE 12 SP5.

ToDo

Iterate over all SLE 12 SP5 related testsuites in the jobgroups mentioned under "Scope" and check if you can find a matching entry for that testsutie in the spreadsheet named draft_redesign_matrix"in the test matrix document.

If you can't match the test suite with an entry for SLE12 SP5 in the draft_redesign_matrix then

  • verify whether if something is wrong for test suite name and setting and then update it
  • verify if it is an unexpected old test suite then remove it

For testsuite that match the draft_redesign_matrix check if the testsuite is consistent.

Example for unexpected base test:

- offline_sles12sp5_pscc_def:
        testsuite: offline_sles12sp5_pscc_sdk_full 

In this example the testsuite offline_sles12sp5_pscc_def uses a stored testsuite (from openQA admin menu) named offline_sles12sp5_pscc_sdk_full that uses the sdk addon which is not required for offline_sles12sp5_pscc_def.

If such a consistency issue is found then

  • copy the needed testsuite settings form the openQA admin page to the job group YAML file.
  • use testsuite: null instead of the wrong testsuite reference.

Scope

Acceptance criteria

AC1: Cleanup for migration from SLE12-SP5 is done, all found issues fixed.

Actions #1

Updated by leli 8 months ago

  • Subject changed from Cleanup for migration from SLE12-SP5 to Cleanup migration test from SLE12-SP5
Actions #2

Updated by leli 8 months ago

  • Description updated (diff)
Actions #3

Updated by leli 8 months ago

  • Description updated (diff)
Actions #4

Updated by leli 8 months ago

  • Description updated (diff)
Actions #5

Updated by leli 8 months ago

  • Description updated (diff)
Actions #6

Updated by rainerkoenig 8 months ago

  • Description updated (diff)
  • Parent task set to #130216
Actions #7

Updated by leli 7 months ago

  • Status changed from New to Workable
  • Target version set to Current
Actions #8

Updated by leli 7 months ago

  • Priority changed from Normal to High
Actions #9

Updated by leli 7 months ago

  • Status changed from Workable to In Progress
  • Assignee set to leli
Actions #11

Updated by leli 7 months ago

  • Status changed from In Progress to Resolved