[security] test fails in apparmor_profile in usr_sbin_smbd - on 15-SP2 only not being able to connect

Added by tjyrinki_suse 8 months ago. Updated 8 months ago.

Status:
Resolved
Priority:
High
Assignee:
Category:
Bugs in existing tests
Target version:
-
Start date:
Due date:
% Done:

100%

Estimated time:
16.00 h
Difficulty:
Tags:

Description

openQA test in scenario sle-15-SP2-Server-DVD-Updates-x86_64-mau-apparmor_profile@64bit fails in
usr_sbin_smbd

Fails since (at least) Build 20230825-1

Last good: 20230823-1 (or more recent)

This differs from ticket #134474 in that the other versions simply suffered from the change to assert_and_click in a way that font looked slightly different on each version.

Here on 15-SP2 only it has actual trouble connecting to smb://10.0.2.15/


Related issues 1 (0 open1 closed)

Related to openQA Tests - action #134474: [security][maintenance] test fails in usr_sbin_smbdResolvedtjyrinki_suse

Actions
Actions #1

Updated by tjyrinki_suse 8 months ago

  • Related to action #134474: [security][maintenance] test fails in usr_sbin_smbd added
Actions #2

Updated by pstivanin 8 months ago

  • Status changed from Workable to In Progress
  • Assignee set to pstivanin
Actions #3

Updated by pstivanin 8 months ago

  • % Done changed from 0 to 20

I wasn't able to reproduce the issue on a local vm using the qcow2 from yesterday's run.

Actions #4

Updated by pstivanin 8 months ago

there was no version updates between the last good test and the failing tests

Actions #5

Updated by pstivanin 8 months ago

  • % Done changed from 20 to 30

seems like the smb daemon is not accepting any connection

Actions #6

Updated by pstivanin 8 months ago

  • % Done changed from 30 to 50

The daemon is alive and accepting connections. Now testing access using smbclient instead of nautilus.

Actions #7

Updated by pstivanin 8 months ago

  • % Done changed from 50 to 70

refactoring is almost done, now testing on all codestreams

Actions #8

Updated by pstivanin 8 months ago

  • % Done changed from 70 to 100
  • Estimated time set to 16.00 h
Actions #9

Updated by pstivanin 8 months ago

  • Status changed from In Progress to Resolved