Project

General

Profile

Actions

action #116329

closed

coordination #115322: [Epic] Update test coverage based on PRD for migration paths in SLE 15 SP5

Add new migration online x86_64 scenarios from SLE-15-SP4 in 'Migration' and 'Migration: Milestone' job groups

Added by zoecao over 2 years ago. Updated about 2 years ago.

Status:
Resolved
Priority:
Normal
Assignee:
Target version:
Start date:
2022-09-08
Due date:
% Done:

100%

Estimated time:

Description

Motivation ####

For new product SLE-15-SP5 we need to setup configuration for scenarios which migrate from SLE-15-SP4.
List of online scenarios to add for x86_64:

SLES:
Daily group:

  • G38: online_sles15sp4_scc_basesys-srv_all_full_y (refer to online_sles15sp3_pscc_basesys-srv-desk-we-python2_all_full_zypp in daily group, with scc_addons basesys-srv; migration_method by yast)

  • G44: online_sles15sp4_pscc_basesys-srv-desk-we-python3_def_full_zypp (refer to online_sles15sp3_pscc_basesys-srv-desk-we-python2_all_full_zypp, with default pattern and replace python2 with python3 in scc_addon, remove DROPPED_MODULES setting)

  • G46: online_sles15sp4_pscc_basesys-srv-live-tsm_def_full_zdup (refer to online_sles15sp3_pscc_basesys-srv-live-tsm_def_full_zdup)

  • G52: online_sles15sp4_pscc_basesys-srv-wsm-contm_all_full_zypp_lock (refer to online_sles15sp3_pscc_basesys-srv-wsm-contm_def_full_zypp, with all patterns and locking package)

Milestone group:

  • G37: online_sles15sp4_rmt_basesys-srv_def_full_zypp (refer to online_sles15sp3_rmt_basesys-srv-desk-we-python2_def_full_y in milestone group, with basesys-srv scc_addon; migration_method by zypper)

  • G40: online_sles15sp4_scc_basesys-srv-desk_def_full_zypp (refer to online_sles15sp3_scc_basesys-srv-desk_all_full_zypp in milestone group, with default pattern)

  • G43: online_sles15sp4_scc_basesys-srv-desk-dev_all_full_y (refer to online_sles15sp3_scc_basesys-srv-desk-dev_def_full_y, with all patterns)

  • G45: online_sles15sp4_rmt_basesys-srv-desk-we-python3_all_full_y (refer to online_sles15sp3_rmt_basesys-srv-desk-we-python2_def_full_y, with all patterns, replace python2 with python3 in scc_addon, remove DROPPED_MODULES setting)

  • G47: online_sles15sp4_smt_basesys-srv-live-tsm_all_full_y (refer to online_sles15sp3_smt_basesys-srv-live-tsm_def_full_y, with all patterns)

  • G53: online_sles15sp4_scc_basesys-srv-wsm-contm_def_full_zypp (refer to online_sles15sp3_scc_basesys-srv-live-tsm-nvidia_def_full_y, with scc_addons basesys-srv-wsm-contm, migration_method by zypper)

SLED (all will change to python3):
For SLED, need to convert the SLED-15-SP3 to SLED-15-SP4 in the cases setting and cases name. (all will change to python3)
Daily group:

  • G55: convert online_sled15sp3_pscc_basesys-desk-we-python2_def_full_zdup
  • G58: convert online_sled15sp3_pscc_basesys-desk-we-dev-python2_all_full_y

Milestone group:

  • G56: convert online_sled15sp3_rmt_basesys-desk-we-python2_all_full_zypp
  • G57: convert online_sled15sp3_scc_basesys-desk-we-dev-python2_def_full_y
  • G59: convert online_sled15sp3_smt_basesys-desk-we-phub-python2_def_full_y

Acceptance criteria ####

AC1: Setup online x86_64 scenarios which migrate from SLE-15-SP4 in 'Migration' and 'Migration: Milestone' job groups
AC2: File a bugs if you find any issues

Suggestions ####

Configuration should be very similar to SLE-15-SP3, only some scenarios are moved to 'Milestone' job group as we run more combination in this job group for newer products. Also we do variations adding all patterns. When checking the reference cases, just refer to the cases in x86_64 for this ticket.
Check migration matrix

Actions #1

Updated by zoecao over 2 years ago

  • Tracker changed from coordination to action
Actions #2

Updated by JERiveraMoya over 2 years ago

  • Target version set to Current
Actions #3

Updated by JERiveraMoya over 2 years ago

  • Description updated (diff)
Actions #4

Updated by JERiveraMoya over 2 years ago

  • Tags deleted (qe-yast-refinement)
  • Status changed from New to Workable
Actions #5

Updated by leli about 2 years ago

  • Status changed from Workable to In Progress
  • Assignee set to leli
Actions #7

Updated by leli about 2 years ago

  • Status changed from In Progress to Resolved
  • % Done changed from 0 to 100

MR merged.

Actions

Also available in: Atom PDF