action #104952
closed
Terraform no cleanup after job termination
Added by asmorodskyi over 2 years ago.
Updated over 2 years ago.
Category:
Bugs in existing tests
Description
Observation¶
openQA test in scenario sle-15-SP2-AZURE-Standard-Staging-Images-x86_64-publiccloud_consoletests@64bit fails in
ssh_interactive_end
Test suite description¶
The base test suite is used for job templates defined in YAML documents. It has no settings of its own.
Reproducible¶
Fails since (at least) Build 20220114 (current job)
Expected result¶
Last good: 20220113 (or more recent)
Further details¶
Always latest result in this scenario: latest
- Tags set to Azure, terraform
- Status changed from New to Workable
- Priority changed from Urgent to High
ok so there is just empty resopurce groups => lowering prio .
- Status changed from Workable to In Progress
- Assignee set to ilausuch
- Status changed from In Progress to Feedback
I checked that the following tests (since https://openqa.suse.de/tests/7981053) didn't failed. And neither the some previous tests I checked.
Could it be sporadic because a lost connection with the Azure API? Doesn't seem a error in the code.
I put that in feedback to be sure that we are observing that in case that happens again. Maybe for this week.
And if this is the case and happens more from now to ahead, we can relax the terraform timeouts.
- Status changed from Feedback to In Progress
- Status changed from In Progress to Feedback
It is merged wainting for the next run to check it out
- Status changed from Feedback to Resolved
Also available in: Atom
PDF