Project

General

Profile

Actions

action #104226

closed

Adjust timeout for open_ssh_port in svirt-hyperv

Added by rainerkoenig almost 3 years ago. Updated over 2 years ago.

Status:
Closed
Priority:
High
Assignee:
Target version:
Start date:
2021-12-21
Due date:
% Done:

0%

Estimated time:

Description

Observation

openQA test in scenario sle-15-SP4-Online-x86_64-lvm+RAID1@svirt-hyperv2016 fails in
open_ssh_port

Test suite description

Testsuite maintained at https://gitlab.suse.de/qa-maintenance/qam-openqa-yml. Maintainer: slindomansilla, jrauch

Combination of LVM and RAID1, installation of RAID1 on top of LVM using expert partitioner.

(crypt-)LVM installations can take longer, especially on non-x86_64 architectures.

Reproducible

Fails since (at least) Build 77.1

Expected result

https://openqa.suse.de/tests/8035199#step/open_ssh_port/1
Last good: 74.1 (or more recent)

Further details

Always latest result in this scenario: latest

Additional info

  • tried to increase QEMURAM from 1024 to 2048, didn't work.
  • problem seems to be that we're waiting for the overiew widget and libyui times out. You can see even the expected text in the screenshot before the error, but for libyui this hit the timeout condition already.
  • Problem occured again on build 88.4. The screenshot shows that the text displayed is still "Adapting the proposal to the current settings..."
Actions #1

Updated by rainerkoenig almost 3 years ago

  • Project changed from openQA Tests to qe-yam
  • Category deleted (Bugs in existing tests)
Actions #2

Updated by rainerkoenig almost 3 years ago

  • Description updated (diff)
Actions #3

Updated by openqa_review almost 3 years ago

This is an autogenerated message for openQA integration by the openqa_review script:

This bug is still referenced in a failing openQA test: lvm+RAID1@svirt-hyperv
https://openqa.suse.de/tests/8089550

To prevent further reminder comments one of the following options should be followed:

  1. The test scenario is fixed by applying the bug fix to the tested product or the test is adjusted
  2. The openQA job group is moved to "Released" or "EOL" (End-of-Life)
  3. The bugref in the openQA scenario is removed or replaced, e.g. label:wontfix:boo1234
Actions #4

Updated by JERiveraMoya over 2 years ago

  • Tags set to qe-yast-refinement
  • Target version set to Current

Still failing in 99.1: https://openqa.suse.de/tests/8196697

Actions #5

Updated by JERiveraMoya over 2 years ago

  • Subject changed from test fails in open_ssh_port to Adjust timeout for open_ssh_port in svirt-hyperv
Actions #6

Updated by JERiveraMoya over 2 years ago

  • Status changed from New to Workable
  • Priority changed from Normal to High
Actions #7

Updated by JERiveraMoya over 2 years ago

  • Tags deleted (qe-yast-refinement)
Actions #8

Updated by JRivrain over 2 years ago

  • Status changed from Workable to In Progress
  • Assignee set to JRivrain
Actions #9

Updated by openqa_review over 2 years ago

This is an autogenerated message for openQA integration by the openqa_review script:

This bug is still referenced in a failing openQA test: lvm+RAID1@svirt-hyperv
https://openqa.suse.de/tests/8345608

To prevent further reminder comments one of the following options should be followed:

  1. The test scenario is fixed by applying the bug fix to the tested product or the test is adjusted
  2. The openQA job group is moved to "Released" or "EOL" (End-of-Life)
  3. The bugref in the openQA scenario is removed or replaced, e.g. label:wontfix:boo1234

Expect the next reminder at the earliest in 32 days if nothing changes in this ticket.

Actions #10

Updated by JRivrain over 2 years ago

  • Status changed from In Progress to Feedback
Actions #11

Updated by JRivrain over 2 years ago

  • Status changed from Feedback to Closed

passed next build

Actions

Also available in: Atom PDF