coordination #130075: [epic] Milestone testing for SLE 15 SP6

SLE15 SP6 RC1 - YaST manual testing

Added by JERiveraMoya about 1 month ago. Updated 25 days ago.

Status:
Resolved
Priority:
Urgent
Assignee:
Target version:
-
Start date:
2023-12-11
Due date:
% Done:

0%

Estimated time:

Description

Motivation

See parent ticket.

Scope

Corresponding milestone build needs to be tested.

Acceptance criteria

AC1: Conduct manual exploratory testing of YaST using corresponding build. Scope is Installer and YaST modules on the installed system.
AC2: Report found issues to Bugzilla with the detailed steps to reproduce and reference it here.
AC3: Briefly describe the covered scenarios in this ticket.

Additional information

The kind of testing for this task is Exploratory testing but in case you need inspiration, you can take a look to this spreadsheet, but this activity is time-constrained so just take it as a reference, no need for following it strictly.
As an agreement we don't test all the architecture/backend for each milestone, so we will be rotating the architecture/backend for each milestone, please consider to pick one different for each build. The architecture considered and the instructions for having running the vm in each one of them is in our Manual Testing guide.

Actions #1

Updated by zoecao about 1 month ago

  • Status changed from Workable to In Progress
  • Assignee set to zoecao
Actions #2

Updated by zoecao about 1 month ago

SLES15SP6 build71.1 manual testing report:

  • Installation with gnome desktop on x86_64, registered with legacy module, dev module and container module and default modules
  • Encrypted disk, no separate home, select/unselect a few patterns in Software and enable ssh port in Installation Overview. After installation, tested yast2 scc, yast2 rmt, yast2 remote, yast2 snapper, yast2 firewall.

No issues or bugs found.

Actions #3

Updated by JERiveraMoya about 1 month ago

  • Tags changed from qe-yam-mar-sprint to qe-yam-apr-sprint
Actions #4

Updated by JERiveraMoya about 1 month ago

  • Status changed from In Progress to Resolved
Actions #5

Updated by JERiveraMoya 25 days ago

  • Due date deleted (2024-03-27)