Project

General

Profile

Actions

tickets #150236

closed

tickets #149954: [Regression] Regression test for SLED 15SP6

tickets #150212: [Regression][Network] Network components of regression tests

[Regression][Network] Network Manager: Switch connection between wired and Mobile Broadband

Added by zcjia about 1 year ago. Updated 9 months ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
not_automated
Target version:
Start date:
2022-10-11
Due date:
% Done:

100%

Estimated time:
Relevance:
P3

Description

Steps:
1.1 a system with wired and Mobile Broadband connection, then remove the
network cable

1.2 a system with wired and Mobile Broadband connection, then remove 3G
card.

1.3 connect with wired, switch connection from wired to 3G (touch Mobile
Broadband connection from Network Manager applet menu)

1.4 connect with 3G, switch connection from 3G to wired (touch wired
connection from Network Manager applet menu)

Comment: Point 1.3 and 1.4 are not suitable for a New
NetworkManager(beyond 0.7),since it will always default to Wired
network(high speed),when wired & 3G all connected.

Expected Result:
VP1.1 the network manager should switch connection to Mobile Broadband
connection idiomatically.

VP1.2 the network manager should connect with cable.

VP1.3 Mobile Broadband connect successfully.

VP1.4 Wired connect successfully.

Comment: VP1.3 and 1.4 are not available.


Related issues 2 (1 open1 closed)

Copied from QE-Workstation - tickets #118003: [Regression][Network] Network Manager: Switch connection between wired and Mobile BroadbandResolvedGraceWang2022-10-11

Actions
Copied to QE-Workstation - tickets #171256: [Regression][Network] Network Manager: Switch connection between wired and Mobile BroadbandNewGraceWang2022-10-11

Actions
Actions #1

Updated by zcjia about 1 year ago

  • Copied from tickets #118003: [Regression][Network] Network Manager: Switch connection between wired and Mobile Broadband added
Actions #2

Updated by zcjia about 1 year ago

  • Target version changed from 15sp5 to 15sp6
Actions #3

Updated by zcjia about 1 year ago

  • Assignee changed from GraceWang to zcjia
Actions #4

Updated by zcjia 9 months ago

  • Assignee changed from zcjia to GraceWang
Actions #5

Updated by GraceWang 9 months ago

  • Status changed from New to Resolved
  • % Done changed from 0 to 100

PASS on RC1-202403

Actions #6

Updated by GraceWang 15 days ago

  • Copied to tickets #171256: [Regression][Network] Network Manager: Switch connection between wired and Mobile Broadband added
Actions

Also available in: Atom PDF