Project

General

Profile

Actions

action #138686

closed

agama installation gets stuck at the end

Added by tbaev 6 months ago. Updated 6 months ago.

Status:
Resolved
Priority:
Normal
Target version:
Start date:
2023-10-27
Due date:
% Done:

0%

Estimated time:

Description

Observation
Flavor agama-live-ALP and agama-live-openSUSE tests fails getting stuck at the end of the installation bar.

Test suite description
The base test suite is used for job templates defined in YAML documents. It has no settings of its own.

Reproducible
Every time.

Fails since Agama Devel build 2.4 (current job)

Acceptance criteria
AC1: wait for dev's fix and verify it can work fine

Test resuts
build 2.4

Actions #1

Updated by rainerkoenig 6 months ago

  • Status changed from New to Workable
Actions #2

Updated by syrianidou_sofia 6 months ago

  • Status changed from Workable to In Progress
  • Assignee set to syrianidou_sofia
Actions #3

Updated by syrianidou_sofia 6 months ago

  • Status changed from In Progress to Resolved

After checking all failed tests in Staging and Devel, this failure is not occurring anymore. We have some failures related to playwright tests, which means that the installation is not starting, but statistically, we should have seen the failure in some of the other tests, if it was still reproducible.

Actions

Also available in: Atom PDF