Actions
tickets #138623
openSeparate management interface for Asgard
Status:
New
Priority:
Normal
Assignee:
-
Category:
Servers hosted in PRG
Target version:
-
Start date:
2023-10-26
Due date:
% Done:
0%
Estimated time:
Tags:
Description
Currently, the fiber trunk on the Orbit hypervisors is passed through to asgard{1,2} and used for all its traffic. This is generally not a problem, however could become one in case the link gets overloaded. As a preventive measure, a second interface passed through to the copper trunk should be added to the asgard VM's, allowing for administrative shell access through a dedicated physical link.
Actions