action #137846

closed

coordination #130216: [epic] Adapt migration test coverage and its migration matrix for SLE 15 SP6

Cleanup migration test from SLE 15 SP4

Added by leli about 1 year ago. Updated about 1 year ago.

Status:
Resolved
Priority:
Normal
Assignee:
Target version:
Start date:
2023-10-13
Due date:
% Done:

0%

Estimated time:

Description

Motivation

After all tickets on optimizing migration from SLE 15 SP4 are resolved, we need to perform a final cleanup for those tests doing a migration from SLE 15 SP4.

ToDo

Iterate over all SLE 15 SP4 related testsuites in the jobgroups mentioned under "Scope" and check if you can find a matching entry for that testsutie in the spreadsheet named draft_redesign_matrix"in the test matrix document.

If you can't match the test suite with an entry for SLE 15 SP4 in the draft_redesign_matrix then

  • verify whether if something is wrong for test suite name and setting and then update it
  • verify if it is an unexpected old test suite then remove it

For testsuite that match the draft_redesign_matrix check if the testsuite is consistent.

Example for unexpected base test:

- offline_sles12sp5_pscc_def:
        testsuite: offline_sles12sp5_pscc_sdk_full 

In this example the testsuite offline_sles12sp5_pscc_def uses a stored testsuite (from openQA admin menu) named offline_sles12sp5_pscc_sdk_full that uses the sdk addon which is not required for offline_sles12sp5_pscc_def.

If such a consistency issue is found then

  • copy the needed testsuite settings form the openQA admin page to the job group YAML file.
  • use testsuite: null instead of the wrong testsuite reference.

Scope

Acceptance criteria

AC1: Cleanup for migration from SLE 15 SP4 is done, all found issues fixed.
AC2: Ensure all new test suites with updated qcows.

Actions #1

Updated by leli about 1 year ago

  • Description updated (diff)
Actions #2

Updated by rfan1 about 1 year ago

  • Status changed from Workable to In Progress
  • Assignee set to rfan1
Actions #3

Updated by rfan1 about 1 year ago

milestone-MR,

start daily job group now.

Actions #4

Updated by rfan1 about 1 year ago

  • Status changed from In Progress to Feedback
Actions #5

Updated by rfan1 about 1 year ago

  • Status changed from Feedback to Resolved