Project

General

Profile

Actions

action #134444

closed

coordination #130072: [epic] Handle openQA adaptions in Yam squad - SLE 15 SP6

adapt yast2_control_center for start_directory_server

Added by hjluo 8 months ago. Updated 8 months ago.

Status:
Resolved
Priority:
High
Assignee:
Target version:
Start date:
2023-08-21
Due date:
% Done:

0%

Estimated time:

Description

Motivation

In 15sp6 build 10.3 yast control center:
the "search 'directory server'" will complain that "this tool is deprecated, you should use dscreate directly". so we'd adapt this change in the module yast2_control_center.pm.

Failed Case:
yast2_control_center

Acceptance criteria

AC1: adapt module yast2_control_center.pm for the deprecated of start_directory_server.

Actions #1

Updated by hjluo 8 months ago

  • Description updated (diff)
Actions #2

Updated by hjluo 8 months ago

  • Subject changed from anested_vm.pm for the removal of libvirtd to adapt yast2_control_center for start_directory_server
Actions #3

Updated by hjluo 8 months ago

  • Project changed from openQA Tests to qe-yam
  • Category deleted (Bugs in existing tests)
Actions #4

Updated by openqa_review 8 months ago

This is an autogenerated message for openQA integration by the openqa_review script:

This bug is still referenced in a failing openQA test: yast2_gui
https://openqa.suse.de/tests/11888572#step/yast2_control_center/1

To prevent further reminder comments one of the following options should be followed:

  1. The test scenario is fixed by applying the bug fix to the tested product or the test is adjusted
  2. The openQA job group is moved to "Released" or "EOL" (End-of-Life)
  3. The bugref in the openQA scenario is removed or replaced, e.g. label:wontfix:boo1234

Expect the next reminder at the earliest in 28 days if nothing changes in this ticket.

Actions #5

Updated by leli 8 months ago

  • Target version set to Current
  • Parent task set to #130072
Actions #6

Updated by leli 8 months ago

  • Status changed from New to Workable
Actions #7

Updated by leli 8 months ago

  • Priority changed from Normal to High
Actions #8

Updated by tinawang123 8 months ago

  • Status changed from Workable to In Progress
  • Assignee set to tinawang123
Actions #10

Updated by tinawang123 8 months ago

  • Status changed from In Progress to Resolved
Actions

Also available in: Atom PDF