Project

General

Profile

Actions

action #111231

closed

Remove validation from jobs svirt-hyperv-* failing due to console reboot (poo#97745) in YaST group

Added by JERiveraMoya almost 2 years ago. Updated over 1 year ago.

Status:
Resolved
Priority:
Normal
Assignee:
Target version:
Start date:
2022-05-18
Due date:
% Done:

0%

Estimated time:

Description

Motivation

SLE-15-SP4 GMC is out and problem with maximum of serial consoles poo#97745 has persisted during the whole Service Pack.
Our scope in YaST squad is the installation for sure, and additionally try to validate those installation with some check. This second part is not possible while this problem is there for svirt-hyperv, waiting for the virtualization team fix it or from other squads to contribute, due there was mentioned some issues with priorities.

The following jobs has this issue in YaST group:

https://openqa.suse.de/tests/overview?arch=&flavor=&machine=svirt-hyperv%2Csvirt-hyperv-uefi&test=&modules=&module_re=&modules_result=failed&distri=sle&version=15-SP4&build=151.1&groupid=129#

  • select_modules_and_patterns+registration@svirt-hyperv
  • select_modules_and_patterns+registration@svirt-hyperv-uefi
  • lvm+RAID1@svirt-hyperv
  • lvm+RAID1@svirt-hyperv-uefi
  • minimal+base_yast@svirt-hyperv
  • minimal+base_yast@svirt-hyperv-uefi
  • msdos@svirt-hyperv

In general this virtualization is pretty slow and the problem is not going to be fixed any time soon, so we can simplify our review process.

Acceptance criteria

AC1: Remove validation from test suites above only for svirt-hyperv.
AC2: Keep at least one of the failure visible and labeled in Development group.

Suggestions

Probably we should not add conditional schedule in existing yaml schedules, but duplicate those files for now.
In future we can see how the recently developed yaml flows could play a role here, i.e. a flow with the name of the progress ticket which clear the validations? right now all the flows are overriden by the schedule file, but just some ideas to think about it :)

Actions #1

Updated by JERiveraMoya almost 2 years ago

  • Description updated (diff)
Actions #2

Updated by JERiveraMoya almost 2 years ago

  • Description updated (diff)
Actions #3

Updated by JERiveraMoya almost 2 years ago

  • Subject changed from draft serial issue to Remove validation from jobs svirt-hyperv-* failing due to console reboot (poo#97745) in YaST group
Actions #4

Updated by JERiveraMoya almost 2 years ago

  • Tags deleted (qe-yast-refinement)
  • Status changed from New to Workable
Actions #5

Updated by hjluo over 1 year ago

  • Assignee set to hjluo
Actions #6

Updated by hjluo over 1 year ago

  • Status changed from Workable to In Progress
Actions #7

Updated by hjluo over 1 year ago

now we just need to cover 15sp5 as we discussed during daily 10/14/2022

Actions #10

Updated by hjluo over 1 year ago

  • Status changed from In Progress to Resolved

PR and MR were merged.

Actions

Also available in: Atom PDF