action #108608

closed

action #100560: [sle][security][sle15sp4][feature][manual] SLE-21539 - QA: bump stunnel to 5.59

[sle][security][sle15sp4][feature][automation] SLE-21539 - QA: bump stunnel to 5.59

Added by bchou about 2 years ago. Updated about 2 years ago.

Status:
Resolved
Priority:
Normal
Assignee:
Category:
New test
Target version:
-
Start date:
2022-03-21
Due date:
% Done:

100%

Estimated time:
20.00 h
Difficulty:

Description

Manual Test case:
https://bugzilla.suse.com/tr_show_case.cgi?case_id=1769815

The packages looks not yet released to Build Public Beta 101.1.
current ver. : stunnel-5.57-3.11.1.x86_64
Will test it once the package is ready.
BTW, there are 2 bugs need to be retested on new package.

Existing bug:
bsc#1180850 - [SLES15SP3][SLE15SP4][Beta2][stunnel] Unable to create certificate via openSSL since stunnel.cnf is missing

bsc#1180969 - [SLES15SP3][SLE15SP4][Beta2][stunnel][FIPS] stunnel: DH_generate_parameters_ex: crypto/dh/dh_gen.c:31: error:050C90CA:Diffie-Hellman routines:DH_generate_parameters_ex:non FIPS method

Actions #1

Updated by bchou about 2 years ago

  • Parent task set to #100560
Actions #2

Updated by bchou about 2 years ago

  • Assignee changed from bchou to rfan1

Hi Richard,
Would you please help to take this feature,
Thanks.

Actions #3

Updated by rfan1 about 2 years ago

  • Status changed from New to In Progress
  • % Done changed from 0 to 10
Actions #4

Updated by rfan1 about 2 years ago

Plan to run mm tests

Actions #6

Updated by rfan1 about 2 years ago

  • % Done changed from 10 to 30

VNC tests are blocked with unknown issue, even stunnel is established, It hangs at there, seems caused by vncviewer, I will file a new bug to track it.

instead, I will use http to test the function.

Actions #7

Updated by rfan1 about 2 years ago

My bad, I tried to connect to server's stunnel port rather than client one.

It can pass with code changes now:
https://openqa.suse.de/tests/8613104
https://openqa.suse.de/tests/8613105

Actions #8

Updated by rfan1 about 2 years ago

  • % Done changed from 30 to 80
  • Estimated time changed from 40.00 h to 20.00 h
Actions #9

Updated by rfan1 about 2 years ago

  • Status changed from In Progress to Feedback
  • % Done changed from 80 to 90

PR merged

Actions #10

Updated by rfan1 about 2 years ago

  • Status changed from Feedback to Resolved
  • % Done changed from 90 to 100