Actions
action #24752
closedadd new release to package list loop
Start date:
2017-07-31
Due date:
2017-11-10
% Done:
100%
Estimated time:
Description
The content of the DVDs is autogenerated. The new release needs to be integrated in the loop
Updated by lnussel over 7 years ago
- Copied from action #14796: add new release to package list loop added
Updated by lnussel over 7 years ago
- Category changed from Release Engineering to Release Engineering
- % Done changed from 0 to 50
preparations done
https://github.com/openSUSE/package-lists/pull/19
still need to run on packagelists once it builds
Updated by lnussel about 7 years ago
- Assignee set to boombatower
Description needs to be adapted. The new way will be to enable pkglistgen as soon as https://github.com/openSUSE/osc-plugin-factory/pull/1196 is in. Jimmy, could you take care of this please?
Updated by lnussel about 7 years ago
- Due date changed from 2017-08-14 to 2017-11-10
- Assignee changed from boombatower to lnussel
Updated by lnussel about 7 years ago
- Status changed from New to Closed
- Assignee deleted (
lnussel) - % Done changed from 50 to 100
This is now done by pkglistgen. It's running on tortuga.
Updated by lnussel over 6 years ago
- Copied to action #37108: enable pkglistgen added
Actions