Project

General

Profile

Actions

action #24752

closed

add new release to package list loop

Added by lnussel over 7 years ago. Updated about 7 years ago.

Status:
Closed
Priority:
Normal
Assignee:
-
Category:
Release Engineering
Target version:
Start date:
2017-07-31
Due date:
2017-11-10
% Done:

100%

Estimated time:

Description

The content of the DVDs is autogenerated. The new release needs to be integrated in the loop

https://github.com/openSUSE/package-lists


Related issues 2 (0 open2 closed)

Copied from openSUSE Leap 42.3 Release - action #14796: add new release to package list loopResolvedmlin74422016-11-142016-11-28

Actions
Copied to openSUSE Leap 15.1 - action #37108: enable pkglistgenResolvedmlin74422018-05-272018-06-22

Actions
Actions #1

Updated by lnussel over 7 years ago

  • Copied from action #14796: add new release to package list loop added
Actions #2

Updated by lnussel over 7 years ago

  • Category changed from Release Engineering to Release Engineering
  • % Done changed from 0 to 50

preparations done

https://github.com/openSUSE/package-lists/pull/19

still need to run on packagelists once it builds

Actions #3

Updated by lnussel about 7 years ago

  • Assignee set to boombatower

Description needs to be adapted. The new way will be to enable pkglistgen as soon as https://github.com/openSUSE/osc-plugin-factory/pull/1196 is in. Jimmy, could you take care of this please?

Actions #4

Updated by lnussel about 7 years ago

  • Due date changed from 2017-08-14 to 2017-11-10
  • Assignee changed from boombatower to lnussel
Actions #5

Updated by lnussel about 7 years ago

  • Status changed from New to Closed
  • Assignee deleted (lnussel)
  • % Done changed from 50 to 100

This is now done by pkglistgen. It's running on tortuga.

Actions #6

Updated by lnussel over 6 years ago

Actions

Also available in: Atom PDF