Project

General

Profile

Actions

action #17016

closed

release manager checklist for GM

Added by lnussel over 7 years ago. Updated about 7 years ago.

Status:
Closed
Priority:
Normal
Assignee:
Category:
Infrastructure
Target version:
Start date:
2017-07-19
Due date:
2017-07-26
% Done:

100%

Estimated time:

Description

Plan for 42.3:

  • log in to download.opensuse.org
  • hardlink files from 42.3/iso into e.g. 42.3/iso-devel in ftp-stage
  • wait for some mirrors to catch up
  • sync the change to ftp
  • install a redirect rule 42.3/iso into 42.3/iso-devel
  • remove world access from iso/ so only staging mirrors can pull it

on release day every once in a while scan for mirrors as mirror user:

mb scan -a -d /distribution/leap/42.3 -j4

In the morning of the release day add the x bit again to make the
content show up and give mirrors time to catch up adding the x bit.

Remove the redirect rule before 12:00 UTC


Related issues 2 (0 open2 closed)

Copied from openSUSE Leap 42.2 Release - action #14602: release manager checklist GMClosedlnussel2016-11-092016-11-16

Actions
Copied to openSUSE Leap 15.0 - action #25050: release manager checklist for GMClosed2018-05-182018-05-27

Actions
Actions #1

Updated by lnussel over 7 years ago

Actions #2

Updated by lnussel about 7 years ago

  • Category changed from Release Engineering to Infrastructure
  • % Done changed from 0 to 20

will be done differently this time, wrote infra

Actions #3

Updated by lnussel about 7 years ago

  • Subject changed from release manager checklist Bugfree to release manager checklist for GM
  • Description updated (diff)
Actions #4

Updated by lnussel about 7 years ago

  • Status changed from New to In Progress
Actions #5

Updated by lnussel about 7 years ago

  • % Done changed from 20 to 80

After discussion with Lars on Friday, no renaming of the iso dir was done. It was accepted that the visible iso content may not be mirrored.

Actions #6

Updated by lnussel about 7 years ago

  • Status changed from In Progress to Closed
  • % Done changed from 80 to 100

not quite as planned but done.

Actions #7

Updated by lnussel about 7 years ago

  • Copied to action #25050: release manager checklist for GM added
Actions

Also available in: Atom PDF