Project

General

Profile

Issues

Filters

Apply Clear

# Subject Project Status Assignee Target version Due date Related issues
258 Convert images from PPM to PNG and resize the images to a fixed size. openQA improvement Closed coolo T02. Refactorize openQA to work with PNG 2013-03-27
259 Adapt the test definitions to the new matching openQA improvement Closed coolo T03. Remove the MD5 approach and create a new API semantic 2013-03-28
294 Replace the basic API that use Perl calls to openCV call in C++ openQA improvement Closed coolo T01. OpenCV Perl bindings 2013-03-28
299 Refactor needels to remove the good label for tag openQA improvement Closed coolo T03. Remove the MD5 approach and create a new API semantic 2013-04-04
301 Write needle DB query API openQA improvement Closed coolo T03. Remove the MD5 approach and create a new API semantic 2013-04-05 Precedes #310
283 add function to verify a needle is no longer present openQA improvement Closed coolo T03. Remove the MD5 approach and create a new API semantic 2013-04-14
281 make license warning clever openQA improvement Closed coolo T03. Remove the MD5 approach and create a new API semantic 2013-04-15
364 Update application tests openQA improvement Closed coolo T03B. Merge openQA changes to upstream 2013-04-26
478 Merge test drivers in a single function openQA improvement Closed coolo T05. Smart test scheduler 2013-05-28
305 Create needles for GNOME installation openQA improvement Closed cwh T03. Remove the MD5 approach and create a new API semantic
531 rescue_cd has no other desktop than xfce openQA improvement Resolved cwh T11. Task for end of iteration
274 Add git repository to Chili openQA improvement Closed cwh Project design and management 2013-04-03
284 find out what livecdreboot handles for users-reboot openQA improvement Closed cwh T03. Remove the MD5 approach and create a new API semantic 2013-04-05
282 find out what distri/opensuse/inst.d/040_spashscreen.pm is all about openQA improvement Closed cwh T03. Remove the MD5 approach and create a new API semantic 2013-04-16
260 Make timeouts globally configurable. openQA improvement Closed cwh T04. Configure a generic time-out 2013-04-24
314 Deploy openQA and integrate os-autoinst openQA improvement Closed cwh T10. Create a development mode in openQA 2013-04-24 Related to #361
264 Add an option to control the error tolerance of waitinststage. openQA improvement Closed cwh T04. Configure a generic time-out 2013-04-26
361 Update WebUI to allow new openQA feaures openQA improvement Closed cwh T03B. Merge openQA changes to upstream 2013-04-30 Related to #314
474 Regular expressions to analyze ISO names openQA improvement Closed cwh T06. Replace the Makefile by a conf. / dispatcher method 2013-05-31
499 Create a RPC function to register new ISO images and create testing jobs for them openQA improvement Closed cwh T06. Replace the Makefile by a conf. / dispatcher method 2013-06-04
521 Refactor Makefile.pm openQA improvement Closed cwh T06. Replace the Makefile by a conf. / dispatcher method 2013-06-07
513 use copy instead of rename() for test results openQA improvement Closed cwh T06. Replace the Makefile by a conf. / dispatcher method 2013-06-11
498 write worker around os-autoinst openQA improvement Closed lnussel T06. Replace the Makefile by a conf. / dispatcher method
652 implement NET test openQA improvement Closed lnussel
300 Add checkneedle method to the API openQA improvement Closed lnussel T03. Remove the MD5 approach and create a new API semantic 2013-04-02
298 Cretate goandclick API function openQA improvement Closed lnussel T03. Remove the MD5 approach and create a new API semantic 2013-04-05
310 Create a way to filter the needles that are used in the test openQA improvement Closed lnussel T03. Remove the MD5 approach and create a new API semantic 2013-04-08 Follows #301
297 Test Tesseract as a better OCR openQA improvement Closed lnussel T03. Remove the MD5 approach and create a new API semantic 2013-04-16
368 implement way to ease migration to 1024 openQA improvement Closed lnussel T03B. Merge openQA changes to upstream 2013-04-23
362 Document the new features openQA improvement Closed lnussel T03B. Merge openQA changes to upstream 2013-04-25
377 get rid of checklog openQA improvement Closed lnussel T05. Smart test scheduler 2013-05-06
380 Exted fail JSON document to put needles candidates openQA improvement Closed lnussel T10. Create a development mode in openQA 2013-05-08
232 Create openCV 2.4.4 package for SLE openQA improvement Closed lnussel T07. Create a package for openCV and openQA 2013-05-10
257 rewrite qemu monitor backend to use json openQA improvement Closed lnussel T05. Smart test scheduler 2013-05-21 Blocks #285
466 Create a basic signaling architecture for os-autoinst openQA improvement Closed lnussel T10. Create a development mode in openQA 2013-05-22
495 design the interface openQA improvement Closed lnussel T06. Replace the Makefile by a conf. / dispatcher method 2013-05-27
496 implement the json dispatcher interface openQA improvement Closed lnussel T06. Replace the Makefile by a conf. / dispatcher method 2013-06-05
230 Replace environment variables set in shell scripts by a real config file openQA improvement Closed lnussel T06. Replace the Makefile by a conf. / dispatcher method 2013-06-06
519 update the packages openQA improvement Closed lnussel T06. Replace the Makefile by a conf. / dispatcher method 2013-06-06
515 write systemd generator for workers openQA improvement Closed lnussel T06. Replace the Makefile by a conf. / dispatcher method 2013-06-07
514 implement isosize and overall again openQA improvement Closed lnussel T11. Task for end of iteration 2013-06-11
525 change file system layout openQA improvement Closed lnussel T11. Task for end of iteration 2013-06-12
(51-92/92) Per page: 25, 50, 100

Also available in: Atom CSV PDF